F26A/0246E: Permission sought for extension to existing house to include (a) construction of first floor extension with pitched roof over existing garage conversion (b) raising of roof level and alterations to existing front porch (c ) window alterations and projecting canopy to rear elevation (d) associated internal alterations, drainage and external works.
2 Saint Columba's Rise, Swords, Co Dublin, K67E0X4
DecisionGrant permission
Decided19 May 2026
Application typePermission
Source documents5
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F26A.0246E_D.pdf / Document 1180029Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F26A.0246E_CE.pdf / Document 1180028Source PDF
- Final GrantSource: planningapi.agileapplications.ie / F26A_0246E.pdf / Document 1187827Source PDF
- ReportsSource: planningapi.agileapplications.ie / F26A0246E.docx / Document 1176188Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F17B/0295Permission for a proposed conversion of existing attached garage to si / 0.0 km away / 14 February 2018Granted
- F23A/0196Retention Permission and full permission for an existing single-storey extension to the rear and side of the existing dwelling and a new two-storey extension to the side and rear of the existing dwelling, with associated alterations to the internal layout and elevations. / 0.1 km away / 15 June 2023Granted
- F21B/0393The construction of a single storey ground floor extension to the rear elevation. Main roof alterations comprising raising of the existing ridge level max 40cm, new roof windows to front north elevation, new roof dormer to the rear south elevation, two new obscure glazed windows to the east elevation, all at first floor level. Required for the provision of two habitable bedrooms, office study and en-suite bathroom at first floor level. To include all associated site works. / 0.1 km away / 26 January 2022Granted
- F24A/0113Permission for the construction of / 0.1 km away / 16 May 2024Granted
- F25A/0006Permission to demolish single storey rear extension and construct a new single storey rear extension and a single storey garage attached to side of existing dwelling house. / 0.1 km away / 27 February 2025Granted
- F22B/0203Single storey extension of rear garden structure to accommodate a new home office, including 2 no. skylights. / 0.1 km away / 18 November 2022Granted
- F14B/0285Single storey extension to the rear of the existing dwelling, containing a WC, kitchen and sunroom. / 0.1 km away / 28 January 2015Granted
- F23A/0147Planning Permission is sought for change of use previously approved under F15A/0474, ABP PL06F.246009, F18A/0227 & F21A/0264) of existing single storey building from Postal Sorting Office to Muslim Prayer, Cultural and Community centre, minor changes to internal layout and external elevations, partial demolition of existing storage shed, new pedestrian access gate and all associated site works at site An Post Sorting Office, The Green (Off Rathbeale Road) Swords, Co. Dublin. / 0.1 km away / 31 May 2023Granted