F26A/0292E: The development consists of the construction of new dormer extensions to the first floor of existing house. The works will include construction of new dormer sections to existing roof extending the first floor area by 31.55 sqm.
Deanstown, Balheary, Swords, County Dublin, K67 E9P9
DecisionRefuse permission
Decided04 June 2026
Application typePermission
Source documents3
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F26A.0292E_D.pdf / Document 1183429Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F26A.0292E_CE.pdf / Document 1183428Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- F06A/1178/E1To construct a revised house type to a two storey and revised site bou / 0.1 km away / 22 May 2012Refused
- F22A/0060The development of a 2 storey, 4-bedroom detached dwelling with detached garage, on-site wastewater treatment system, landscaping and boundary treatment, along with all associated site and infrastructural works necessary to facilitate the proposed development. / 0.6 km away / 06 April 2022Refused
- F20A/0200Detached 4 bedroom, 262sqm, two storey, pitched roof dwelling house with detached garage, wastewater treatment facility and associated site works. / 0.6 km away / 20 July 2020Refused
- F18A/0422Permission to relocate existing farmstead and dwelling from Minister's / 1.2 km away / 12 September 2018Refused
- F18A/0641To relocate the existing farmstead and farm buildings from Ministers R / 1.2 km away / 14 January 2019Refused
- F20A/0584The proposed development will consist of the following: The construction of 1 no. detached, 2-storey 4-bedroom dwelling, a single storey detached garage, new vehicular entrance and driveway from Balheary Road and on-site waste water treatment system, landscaping, boundary treatment along with all associated ancillary site development and engineering works necessary to facilitate the development. / 1.4 km away / 20 January 2021Refused
- F19A/0424Dwelling house, detached domestic garage, wastewater treatment unit an / 1.4 km away / 01 November 2019Refused
- F18A/0519Dwelling house, detached domestic garage, wastewater treatment unit an / 1.4 km away / 06 November 2018Refused