FW12A/0059: The development consists of the change of use of St Michaels Hall as a
Cappagh National Orthopaedic Hospital Ltd., Ratoath Road, Finglas, Dub
DecisionGrant permission for retention
Decided16 August 2012
Application typeRetention
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW16A/0063Permission for retention and permission for development in the Convent / 0.0 km away / 20 June 2016Granted
- FW21A/0098The development will consist of the retention of existing one-storey modular construction building with 118sqm floor space which currently accommodates open-plan offices with 1 no. enclosed office, 2 nos WC services and an external protected access to the existing main building (retention permission); and permission for the provision of an additional first floor in modular construction with 118sqm floor space to accommodate changing rooms and lockers and 2 nos. WC services and 2 nos. external metal stairs to the first floor. AI received 16/08/21 / 0.0 km away / 02 September 2021Granted
- FW21A/0097The development will consist of the provision of a new two-storey office and staff facilities building of area 323 sqm. within the curtilage of the Cappagh National Orthopaedic Hospital. The new modular construction building will include a canteen, an office/meeting space, two changing rooms and WC facilities on the Ground Floor; and offices with ancillary services at the First Floor level. Ancillary landscaping works will also be included in the application. AI received 16/08/21 / 0.0 km away / 07 September 2021Granted
- FW18A/0172Single storey extension to the front, the single storey in-fill of two / 0.0 km away / 22 January 2019Granted
- FW26A/0125EPermission for the demolition of the existing entrance conservatory and the construction of a main entrance lobby incorporating a waiting area and external portico and all associated works at ground floor level. / 0.0 km away / 19 May 2026Granted
- FW26A/0082EPermission for two number above ground static Firefighting water storage tanks and associated site works all on the campus of the hospital. / 0.1 km away / 23 April 2026Granted
- FW23A/0006Construction of three storey extension to the Convent Buildings for Radiology, Education and Storage, with external staircase, rooftop solar panels, plant and screening and ancillary works at The National Orthopaedic Hospital. / 0.1 km away / 27 February 2023Granted
- FW24A/0254EAlterations to development previously approved under Reg. Ref. FW23A/0006: the alterations comprise of:(a) increased height of external staircase to access the roof; (b) increased floor area across the three storeys from 893.7sq m to 919.6sq m and resultant amended South Elevation and (c) change from 'Blue Roof' to other SUDS measures / 0.1 km away / 30 July 2024Granted