FW12A/0085: Permission to redevelop an area of 0.98 HA to the west of the M50 Moto
Luttrellstown Road, Diswellstown, Castleknock, Dublin 15
DecisionGrant permission
Decided11 December 2012
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Luttrellstown Road, Diswellstown, Castleknock, Dublin 15?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW18A/0126Construction of concrete apron and small walled enclosure / 0.0 km away / 18 October 2018Granted
- FW14A/0116Permission for for a new 349.3m2 single storey prefabricated office bu / 0.0 km away / 07 January 2015Granted
- FW21A/0045The proposed works consist of the following: / 0.0 km away / 26 April 2021Granted
- FW13A/0080The development will consist of: 1. Lowering of the existing ground le / 0.1 km away / 10 September 2013Granted
- FW12A/0009Retention of an existing 148.4 m², two storey, maintenance and storage / 0.1 km away / 21 March 2012Granted
- F08A/1355/E2Renovations to and redevelopment, including extensions, of the existin / 0.1 km away / 12 September 2014Granted
- FW18A/0124Alterations to development permitted under Reg. Ref: F08A/1355 to cons / 0.2 km away / 15 October 2018Granted
- FW21A/0141Construction of a single storey packaged boiler house kiosk, a boiler fuel gas PRS kiosk and door replacement to existing skid house as part of a capacity upgrade to an existing Above Ground Natural Gas Installation. Associated ancillary services & site works will also be required to facilitate the works. / 0.2 km away / 30 September 2021Granted