FW13A/0018: Extension to and modifications of the Dogs Trust Rehoming Centre previ
Dogs Trust Rehoming Centre, North Road/Ashbourne Road (R135), Townland
DecisionGrant permission
Decided24 April 2013
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW13A/0143Planning Permission and Retention Permission for development at this s / 0.0 km away / 17 February 2014Granted
- FW23A/0234The development will consist of the construction of a / 0.2 km away / 22 January 2024Granted
- F19A/0218Amendments to Planning Permission reference F17A/0769 as granted. The / 0.2 km away / 22 October 2019Granted
- FW21A/0151• Demolition of 2 no. existing residential dwellings and ancillary structures to the east of the site (c.344qm total floor area); • Construction of 2 no. data hall buildings (Buildings A and B) comprising data hall rooms, mechanical and electrical galleries, ancillary offices including meeting rooms, workshop spaces, staff areas including break rooms, toilets, shower/changing facilities, storage areas, lobbies, outdoor staff areas, loading bays and docks, associated plant throughout, photovoltaic panels and screened plant areas at roof levels, circulation areas and stair and lift cores throughout; • External plant and 58 no. emergency generators located within a generator yard to the east and west of Buildings A and B at ground level. The area is enclosed by a c.6.5m high louvred screen wall; • The proposed data halls (Buildings A and B) are arranged over 3 storeys with a gross floor area of C.37,647sqm each; • The overall height of the data hall buildings is c28m to roof parapet level and c32m including roof plant, roof vents and flues. The total height of Buildings A and B does not exceed 112m OD (above sea level); • The proposed development includes the provision of a temporary substation (c.32sqm), water treatment building (c. 369sqm and c.7.7m high), 7 no. water storage tanks (2,800m3 in total and c.6.4m high each), 2 no. sprinkler tanks (c.670m3 each and c.7.9m high each) with 2 no. pump houses each (c.40sqm and c. 6m high each); • The total gross floor area of the data halls and ancillary structures is c.75,775sqm; • All associated site development works, services provision, drainage upgrade works, 2 no. attenuation basins, landscaping and berming (c.6m high), boundary treatment works and security fencing up to c.2.4m high, new vehicular entrance from the North Road, secondary access to the south west of the site from the existing private road, all internal access roads, security gates, pedestrian/cyclist routes, lighting, 2 no. bin stores, 2 no. bicycle stores serving 48 no. bicycle spaces, 208 no. parking spaces including 10 no. accessible spaces, 20 no. electric vehicle charging spaces and 8 no. motorcycle spaces; • Existing electricity overhead lines traversing the site will be undergrounded under concurrent application Ref. FW21A/0144; • A proposed 220kv substation located to the south west of this site will be subject of a separate Strategic Infrastructure Development application to An Bord Pleanála under section 182A of the Planning and Development Act 2000 (as amended); • An Environmental Impact Assessment Report (EIAR) is submitted with this application. AI received 11/02/2022 AI deemed significant ** revised public notices 24/2/2022 / 0.2 km away / 20 April 2022Granted
- FW22A/0213The development is within a total site area of up to c. 1 ha. to include 1 no. DSO (Distribution System Operator) electrical substation building. 1 no. customer switchgear, electrical inverter / transformer station modules. 40 no. containerised battery storage units on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, underground cabling route c. 1.45 km to existing ESB 220kV Finglas Electricity Substation, associated electrical cabling and ducting, security gates, palisade perimeter security fencing, CCTV security monitoring system and landscaping works and all associated ancillary site infrastructure. AI received 21/12/22 / 0.2 km away / 19 January 2023Granted
- FW22A/0182The proposed development consists of a photovoltaic array (443.9m2) on the roof of the existing building, and all associated infrastructure. AI received 02/12/22 / 0.2 km away / 20 December 2022Granted
- FW19A/0053The proposed development consists of amendments to Planning Permission / 0.2 km away / 21 May 2019Granted
- FW24A/0321ERetention Permission for: Construction of a single storey storage shed in yard of existing industrial premises and all ancillary site works. / 0.2 km away / 27 September 2024Granted