FW17A/0073: The Construction of a 2 bedroom two story dwelling
29 Woodvale Garth, Clonsilla, Dublin 15
DecisionRefuse permission
Decided15 June 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW17B/0096Proposed conversion of attic space with new dormer roof extension to t / 0.1 km away / 02 February 2018Refused
- FW24A/0383EA two storey dormer extension to the rear expanding Kitchen/ Dining area, addition of two new bedrooms to dormer space and new ground floor window to side lane, including all associated site works. / 0.1 km away / 12 November 2024Refused
- FW20A/0199Permission for 1. Demolition of the following: (i) existing dwelling (totalling 208.78 sq.m) at No. 1 Blakestown Cottage, Blakestown Road, Dublin 145 (D15 V34W); (ii) existing dwelling (totalling 194 sq.m) and 2 no. sheds (totalling 127 sq.m) at 7A Blakestown Cottage, Blakestown Road, Dublin 15 (D15 X0DV); and, (iii) existing boundary wall to the front of the development. 2. Construction of 33 no. apartment, comprising of 16 no. one-bedroom apartments and 17 no. two-bedroom apartments, in 2 no. three storey blocks. Each apartment is provided with a private balcony or terrace and access to 1018 sq.m of communal open space featuring a playground. The proposed development is served by 28 no. car parking spaces, 50 no. bicycle parking spaces and a bin store (27 sq.m); 3. Creation of a new vehicular and pedestrian entrance from Blakestown Road along the eastern boundary; and 4. All associated site, landscaping, infrastructural works, including tree planting, boundary treatments, street lighting, internal roadways, footpaths, foul/surface drainage, necessary to facilitate the development. / 0.3 km away / 29 January 2021Refused
- FW20A/0008The construction of telecommunications infrastructure comprising of; an 18 metre high monopole with telecommunications equipment attached, and ancillary ground based equipment, cabinets and fencing to the rear of Salmon's Public House Mountview Rd Coolmine Dublin 15 / 0.3 km away / 16 March 2020Refused
- FW25A/0249EPermission for the demolition of Salmon's Public House and Paddy Power Bookmakers and for the construction of a Family Hub and Medical/Counsel Suite. A Family Hub is 'A form of supported temporary accommodation specifically designed for families who are experiencing homelessness, typically sourced from the local authority social housing waiting list or homeless register.' The proposed building shall be 3 storeys and contain 40 family rooms, including universal accessible room, dining facilities, living area, play and homework rooms, outdoor child play area, landscaping and all associated site works. AI Received 15/09/2025 / 0.3 km away / 09 October 2025Refused
- FW16A/0130Permission for detached two storey dwelling and a new vehicular access / 0.3 km away / 27 January 2017Refused
- FW15A/0058Permission for a detached two storey dwellling and a new vehicular / 0.3 km away / 23 June 2015Refused
- FW11A/0079Permission for development at a site on the corner of Woodvale Grove / 0.3 km away / 22 August 2011Refused