FW17A/0097: Consisting of alterations and amendments to the previously approved FN
Swords Laboratories t/a Bristol-Myers sq, Cruiserath Road, Mulhuddart,
DecisionGrant permission
Decided04 August 2017
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Swords Laboratories t/a Bristol-Myers sq, Cruiserath Road, Mulhuddart,?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- F05A/1610/E1Planning permission on a 10.5 hectare site at Cruiserath and Hollywood / 0.2 km away / 11 April 2011Granted
- FW12A/0106Planning permission for a mixed use development to consist of the omis / 0.2 km away / 30 November 2012Granted
- FW12A/0105Planning permission for the creation of 10 no. 5-A-Side soccer pitches / 0.3 km away / 05 December 2012Granted
- FW16A/0002Permission for the demolition and removal of a number of buildings/str / 0.3 km away / 03 May 2016Granted
- FW15A/0043Permission for the construction of a new Biopharmaceutical Manufacturi / 0.3 km away / 29 May 2015Granted
- FW23A/0342EIAR NIS The development will consist of all site buildings and infrastructure required to support the new facility including; (a) A 2-storey Biopharmaceutical Development and Manufacturing Building sized approximately 11,670 square metres and approximately 15.5 metres high, with roof-mounted plant and equipment, including solar panels. (b) The refurbishment and extension of the existing 2-storey Laboratory, to include ground-mounted and roof-mounted plant and equipment, including solar panels and an extension to the existing plant room at roof level sized approximately 115 square metres and approximately 9.1 metres high. (c) A single story pedestrian and materials link sized approximately 420 square metres and approximately 7 metres high from the proposed Production Building to the existing Warehouse. (d) A single story pedestrian canopy from the proposed production building to the existing administration building, sized approximately 520 square metres and approximately 8.3 metres high. (e) A single storey pedestrian canopy from the proposed production building to the existing laboratory building, sized approximately 234 square metres and approximately 8.3 metres high. (f) Provision of new car parking spaces including an additional 185 car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the R121. (g) Proposed site infrastructure includes bunded tanks, pipe-bridges, sprinkler and water tanks, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, heat-pumps, underground pumping facilities, internal roads and paths, fencing and site lighting, and the use of the existing BMS site entrances for heavy goods vehicles. (h) The development includes modifications to the existing internal road network. (i) Proposed new landscaping includes new landscaped and planted areas, modifications, replacement and reinforcement of the existing landscaping. (i) Proposed New Signage based at ground level and on the proposed building façade. (k) The works will include temporary contractor compounds including temporary construction cabins, temporary car parking and the temporary use of existing site entrance road (currently not in use) to the north of the site from the Cruiserath Road, during construction activities. (l) Proposed new surface water management infrastructure for the site, consisting of Sustainable Drainage features including a detention basin, rainwater harvest cisterns and distribution pipework. (m) Modifications to existing buildings in the Development and Manufacturing Campus including elevational alterations and modifications to the existing satellite administration, canteen and laboratory buildings to the south of the site, adjacent to the proposed development. (n) All Associated Site Works. The proposed development will be built in 2 phases, with phase 2 comprising of approximately half of the proposed administrative floor area and the proposed pedestrian canopies to the existing administration and laboratory buildings. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application, and they will be available for inspection or purchase at the office of the Planning Authority. / 0.3 km away / 11 January 2024Granted
- FW22A/0203The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23 / 0.3 km away / 17 February 2023Granted
- FW22A/0285The development will consist of / 0.3 km away / 30 January 2023Granted