FW18A/0064: Erection of a totem sign at the entrance to Ballycoolin Business & Tec
Ballycoolin Business & Technology Park, Ballycoolin Road, Blanchardsto
DecisionGrant permission
Decided14 January 2019
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballycoolin Business & Technology Park, Ballycoolin Road, Blanchardsto?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW25A/0431EThe development will consist of the following A) Replacement of existing external branding signage, and B) New external branding signage. This will include the replacement of existing wall mounted signage, the replacement of existing totem and monolith signage along the site boundary, and the erection of branded flags on existing flag poles. / 0.1 km away / 17 November 2025Granted
- FW15A/0096Permission for the modification to the North elevation of the existing / 0.1 km away / 26 August 2015Granted
- FW13A/0139Permission for the change of use, increase in internal area and modifi / 0.1 km away / 17 February 2014Granted
- FW12A/0083Planning retention appplication for minor adjustments to the 110kV / 0.2 km away / 11 October 2012Granted
- FW25A/0535EPlanning permission is sought for: - Removal of 22 parking spaces to accommodate the proposed development. - Provision of a Battery Energy Storage System (BESS) compound with a total area of c. 553.8 sq.m. comprising four containerised battery units and one electrical transformer. The self-contained battery units will have a maximum height of c. 3 m and will be c. 8.8 m in length and c. 1.65 m in width. The transformer will have a maximum height of c. 3.25 m and will be c. 4.75 m in length and c. 4 m in width. - The proposed battery compound will be enclosed with security fencing to a maximum height of 2.7m with entrance gates along the southern boundary and western boundary. - All associated development including electrical connections, landscaping and planting, boundary treatments, CCTV, lighting, and all associated ancillary works. / 0.2 km away / 10 February 2026Granted
- FW11A/0104To construct a new AIS (Air Insulated Switchgear) 110kV electricity su / 0.2 km away / 01 December 2011Granted
- FW16A/0163Permission is sought for the continued use of the existing 36m high, f / 0.2 km away / 23 December 2016Granted
- FW11A/0048Permission to retain the existing 36m high, free standing lattice type / 0.2 km away / 17 June 2011Granted