GrantedDecided 09 January 2020Fingal County Council

FW19A/0147: Provision of a generator and air handling unit compound including 4 no. stainless steel flues, all to the south-east corner (rear and side of existing building), and provision of 218 sq.m. internal mezzanine plant area within the existing structure, all required to proivde critical technical support to Data Hall 3. Additional Information Lodged on 5th Dec 2019

Kepple, Unit B10 IDA Business Park, Ballycoolin, Dublin 15, D15 YN9K
DecisionGrant permission
Decided09 January 2020
Application typePermission
Source documents13

Site

What is on file

0refusal reasons11conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

  • 1Development to be carried out in accordance with lodged plans and additional information received 05/12/19.Compliance
  • 2Site to be used as data hall and ancillary offices. Extension not to be let/sold separately. No sub-division or amalgamation without prior approval.Other
  • 3External finishes to match existing structure in materials, textures, and colours.Design Materials
  • 4No additional external lighting, signage, structures, or advertising devices without further planning permission.Design Materials
  • 5All public services (electrical, telephone cables/equipment) to be located underground throughout the site.Design Materials
  • 6Comply with EHO Air & Noise Unit requirements: construction noise restricted to Mon-Fri 8am-7pm, Sat 8am-1pm; no work Sundays/Bank Holidays or 7pm-8am. Operational noise not to exceed background by 10dB(A) or NG4 limits (Day 55dB, Eve 50dB, Night 45dB). No malodours, fumes, or nuisance emissions.Environment Ecology
  • 7Max discharge 2 l/s/ha or Qbar. Submit acceptable surface water drainage proposal (SuDS/flow control) for agreement prior to commencement. No surface water into foul system. Comply with Greater Dublin Regional Code of Practice for Drainage Works v6.0.Wastewater Drainage
  • 8Sign Irish Water connection agreement prior to commencement and adhere to its standards.Water Services
  • 9Fuel containers for standby generators to be bunded to 110% volume or 25% overall storage, whichever is greatest. BS EN 1992-3:2006 applies for concrete containers.Environment Ecology
  • 10Submit revised plans prior to commencement demonstrating potential to recycle heat into a district heating scheme if implemented.Other
  • 11Pay €15,683 (updated per Tender Price Index) contribution to Planning Authority prior to commencement. Phasing to be agreed in writing.Development Contribution

Planning a project near Kepple, Unit B10 IDA Business Park, Ballycoolin, Dublin 15, D15 YN9K?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →