FW19A/0166: Internal alterations and refurbishment of existing office and industri
JCPS Mechanical Offices, Unit 48B Rosemount Park Drive, Ballycoolin,
DecisionGrant permission
Decided28 November 2019
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near JCPS Mechanical Offices, Unit 48B Rosemount Park Drive, Ballycoolin,?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- FW15A/0031Planning permission is sought for extension to front (south facing) / 0.2 km away / 28 April 2015Granted
- FW18A/0189Extension and modifications to previously approved planning applicatio / 0.2 km away / 19 February 2019Granted
- FW17A/0089The construction of a circa 8,500 square metre warehouse/distribution / 0.2 km away / 13 July 2017Granted
- FW18A/0152Change of use of 23.2 m2 of an existing mezzanine floor within the war / 0.2 km away / 07 February 2019Granted
- FW16A/0185Construction of a mezzanine floor for storage use within the warehouse / 0.2 km away / 16 February 2017Granted
- FW21A/0145Installing 222.4m² (44.88kW) of PV solar panels onto the western slope of the existing warehouse roof cladding. / 0.2 km away / 05 October 2021Granted
- FW24A/0150Planning permission to erect an ESB Sub-Station, and switch room with associated site works. Access to the proposed ESB Sub-Station, and switch room will be from the public road in Stadium Business Park, and the decommissioning and demolition of the existing ESB Sub-Station and switch room on site. / 0.2 km away / 29 May 2024Granted
- FW23A/0363Construction of a new 9.5 m high warehouse extension to the existing facility for the storage production processing packaging and distribution of agricultural produce complete with minor inter modifications with a ground floor extended area of 710 sq.m and associated site development and ancillary works. / 0.2 km away / 25 January 2024Granted