9 Maple Glen, Castleknock, Dublin 15, D15 W97P
Planning application FW19A/0196
DecisionGrant permission
Decided18 June 2020
Application typePermission
Source documents11
Site
What is on file
0refusal reasons13conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with submitted plans and additional information dated 24 April 2020.Compliance
- 2Dwelling to be used as a single dwelling unit except as exempted development.Occupancy
- 3Submit details of proposed finishes to exterior walls and roof prior to commencement.Design Materials
- 4Omit first floor rear window serving Bedroom No. 1 to protect residential amenity.Design Materials
- 5Access and boundary wall requirements including written agreement with Planning Authority for driveway works.Traffic Access
- 6Foul drainage to comply with regional codes and no discharge to surface water system.Wastewater Drainage
- 7Remove street tree at applicant's expense with replacement planting and protection of adjacent street tree.Landscaping Boundary
- 8All bathroom and en-suite rooms to have permanently maintained obscure glass, film not acceptable.Design Materials
- 9Prevent spillage or deposit of materials on roads and repair any damage caused during construction.Construction Management
- 10All public services including cables to be located underground throughout the site.Other
- 11Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat, no work on Sundays or Bank Holidays except with prior approval.Construction Management
- 12Developer to sign connection agreement with Irish Water prior to commencement and submit proposals for works affecting water/wastewater services for approval.Water Services
Planning a project near 9 Maple Glen, Castleknock, Dublin 15, D15 W97P?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 69 pages of searchable text on file.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 9 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
11 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW16A/0049The development will consist of subdivision of existing extended house / 0.0 km away / 15 July 2016Granted
- FW14A/0154Planning permission for demolition of a single storey side extension / 0.0 km away / 11 February 2015Granted
- FW23B/0032The development will consist of the demolition of existing / 0.0 km away / 04 August 2023Granted
- FW25A/0453EAn extension to the rear of an existing house and to an existing attic / 0.1 km away / 11 December 2025Granted
- FW25A/0353Permission is sought for the conversion of the attic space for the use / 0.1 km away / 14 October 2025Granted
- FW13B/0033A. Attic conversion incorporating dormer extension to rear; B. All ass / 0.1 km away / 18 July 2013Granted
- FW24A/0217The development will consist / 0.1 km away / 09 July 2024Granted
- FW18B/0087For the retention of: (A) Construction of a Front entrance porch and / 0.1 km away / 12 September 2018Granted