FW20A/0176: The development will consist of the construction of an internal first and second floor mezzanine floor of 830 square metres, within the existing Industrial Building of measuring 2,920 square metres, for storage purposes only. Two new internal access stairs and all associated works. The removal of the existing signage measuring 22m2 located to the front (South) elevation and replacement with new 11.1m2 non illuminated corporate signage, provision of new signage above all twelve loading bay doors measuring 9.7m2 each. New signage positioned as: one to south elevation, one to west elevation, eight to north elevation, two to east elevation.
Unit 615, Kilshane Avenue, North West Business Park, Ballycoolin, Dubl
DecisionGrant permission
Decided03 December 2020
Application typePermission
Source documents8
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 615, Kilshane Avenue, North West Business Park, Ballycoolin, Dubl?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FDC062CA5F2811EB9D3C3464A927EB6F.tif / Document 742041Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FDC062CD5F2811EB9D3C3464A927EB6F.tif / Document 731767Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 353779FA5FBA11EB86240050569212E6.pdf / Document 706847Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / 1EA439F0389411EB9D9CD81265958418.pdf / Document 667981Source PDF
- ReportsSource: planningapi.agileapplications.ie / 1A1E3EFA2B2D11EB861D005056925056.pdf / Document 667507Source PDF
- ReportsSource: planningapi.agileapplications.ie / 57084A4E1F5F11EB861C005056924457.pdf / Document 673801Source PDF
- ReportsSource: planningapi.agileapplications.ie / E0704971355F11EB861D00505692A522.docx / Document 698792Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW23A/0092The application site is bound by Kilshane Avenue to the south, the permitted access road to a warehouse/ logistics development (permitted under Reg. Ref.: FW22A/0156) to the west, a light industrial/warehouse unit to the east (occupied by Kirby Tyres), and a vacant site (under the control of the applicant) to the immediate north. The proposed development consists of the construction of a single-storey building with a total gross floor area (GFA) of 499 sq.m with an overall height of 6m, to include (1) a café / restaurant unit with a GFA of 256 sq.m, and (2) a convenience retail unit, with a GFA of 243 sq.m (150 sq.m net retail area), and a delicatessen area; and includes use for the preparation and sale of hot food and beverages for consumption on and off the premises within both units. The proposal includes the provision of 26 no. car parking spaces, 3 no. motorcycle parking spaces, and 20 no. cycle parking spaces. The proposal includes vehicular and pedestrian access off the permitted access road to a warehouse/logistics development (permitted under Reg. Ref.: FW22A/0156) to the west, pedestrian access from Kilshane Avenue to the south, and proposed infrastructure provided up to the application site boundary to facilitate potential future vehicular access to the adjoining lands to the north. The development also includes signage zones on the building, associated outdoor seating area and terrace for the café / restaurant unit, green roof, service yards and delivery area, landscaping, boundary treatments, lighting, ESB substation, cycle and pedestrian infrastructure, foul and surface water drainage, an entrance signage zone relating to the warehouse/logistics development permitted under Reg. Ref.: FW22A/0156, site clearance and all associated works. AI received 9/8/2023 / 0.1 km away / 30 August 2023Granted
- FW25A/0166EWe, Earlsland Corporation Unlimited Company, intend to apply for planning permission for development on lands adjacent to Unit 900, Northwest Logistics Park, Ballycoolin, Dublin 15. The application site is located to the west of Unit 900, which is accessed from Kilshane Avenue, is situated to the south of Bay Lane, and is bound to the west by the lands where Ellipse Logistics Park is under construction. The proposed development is for an extension of the existing warehouse / logistics unit to provide an additional 9,080 sq.m of warehouse / logistics floor space, comprising one level with a maximum height of c. 17.09m. The proposal includes an extended service yard and dock levellers, plant rooms, PV panels at roof level, foul and surface water drainage, landscaping, boundary treatment, lighting and all associated works. Additional Information Received 18/07/2025 Clarification of AI received 16/10/25 / 0.2 km away / 11 November 2025Granted
- FW13A/0133Planning permission and Retention planning permission is sought by GTO / 0.2 km away / 05 February 2014Granted
- FW18A/0181To construct a 1,733 sqm extension to the existing premises to include / 0.2 km away / 30 January 2019Granted
- FW20A/0082For changes to planning granted under reference no. FW19A/0086, for the reposition of a generator to avoid underground drainage and omission of enclosure screen for generator & associated flue along with changes to planning granted under reference no. FW18A/0181, for the relocation & redesign of the bike shelter, additional 9 no. bicycle spaces, relocation & redesign of the temporary modular building unit, installation of a smoking shelter. Minor revisions to the carpark layout & revision of the site layout, additional 15 no. car park space, addition of a pedestrian entrance gate, omission of small grassed area & security hut, reduced landscaping plan, addition of external air conditioning plant & revised design for the sprinkler pump house, addition of an external caged access ladder & edge protection railing to the rear of the original building. Changes to the fenestration of the north elevation to include louvers replaced with windows in the office block, additional louvres & larger double doors installed in the plantroom & a louvred lantern roof section constructed above the plantroom. / 0.2 km away / 27 July 2020Granted
- FW19A/0086To relocate a standby generator with flue and associated fuel tank / 0.2 km away / 22 July 2019Granted
- FW25A/0119EThe development will consist of: Amendment to permission granted under Reg. Ref.: FW23A/0126 for minor alterations to the location of the bus stop located on Kilshane Avenue to the north of the site. The bus stop is relocated to sit off Kilshane Avenue. / 0.2 km away / 15 May 2025Granted
- FW23A/0126The development will consist of: / 0.2 km away / 19 June 2023Granted