FW20B/0055: The demolition of the exisiting single storey rear extension and the construction of a single storey extension to the side and rear, new bay window and entrance door relocation to the front, a second floor extension on existing ground floor extension to the side, the conversion of the attic to a bedroom with roof alterations to include a dormer roof to the rear, pitched roof construction to the new gable and velux windows to the front and all associated site works.
29 The Grove, Hunter's Run, Clonee, Dublin 15
DecisionGrant permission
Decided16 July 2020
Application typePermission
Source documents8
Site
What is on file
0refusal reasons11conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
- 1Development to be carried out in entirety in accordance with lodged plans, particulars and specifications.Compliance
- 2Omit rear dormer and all front roof lights. Submit revised elevational drawings and floor plans for written agreement prior to commencement. Dormer may be replaced by rooflights subject to agreement.Design Materials
- 3Any room or attic floorspace not complying with Building Regulations for habitable standards shall not be used for human habitation.Compliance
- 4All external finishes to harmonise in materials, colours and texture with the existing premises.Design Materials
- 5Entire premises to be used as a single dwelling unit apart from exempted development.Occupancy
- 6Submit surface water drainage proposal complying with SuDS principles and GDSDS Regional Drainage Policies prior to commencement. No surface water to discharge into foul system. Compliance with Greater Dublin Regional Code of Practice for Drainage Works v6.0.Wastewater Drainage
- 7Prevent spillage/deposit of materials on adjoining roads during development; immediate removal at developer's expense. Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
- 8All public services, including electrical and telephone cables and associated equipment, to be located underground throughout the entire site area.Other
- 9All bathroom and en-suite rooms to be fitted and permanently maintained with obscure glass; use of film is not acceptable.Design Materials
- 10Site development and building works restricted to 08:00-19:00 Mon-Fri, 08:00-14:00 Sat, and not at all on Sundays/public holidays unless otherwise agreed in writing.Construction Management
- 11Pay development contribution of €4,390 (updated per Tender Price Index at commencement) to Planning Authority for public infrastructure/facilities. Phasing to be agreed in writing prior to commencement.Development Contribution
Planning a project near 29 The Grove, Hunter's Run, Clonee, Dublin 15?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / 334976E0E92D11EA85EB005056926A5C.pdf / Document 670132Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / 4BB6AA79D33311EA85E9005056926A5C.pdf / Document 672398Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 02736DDBE92D11EA85EB005056926A5C.pdf / Document 668505Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / 52410411D33311EA85E9005056926A5C.pdf / Document 672795Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 90B1CDD7EBA711EA8BC93464A927E5D1.pdf / Document 695811Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / BEC788BD1DB711EB861C005056924457.pdf / Document 685355Source PDF
- ReportsSource: planningapi.agileapplications.ie / DA039CB4A1A311EA860F00505692A522.pdf / Document 688787Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW20B/0153Permission for alterations to the previously approved planning application FW20B/0055. Namely the removal of condition 2(a) relating to the removal of the proposed dormer in the rear and condition 2(b) removal of roof lights in the front plane. / 0.0 km away / 11 January 2021Granted
- FW18B/0093The development will consist of the change of use and conversion of ex / 0.0 km away / 09 October 2018Granted
- FW19B/0003The development will consist of the change of use and conversion of ex / 0.0 km away / 11 March 2019Granted
- FW20B/0030The development consists of the erection of a single storey shed unit to the rear of existing dwelling (20.5 sqm) for the purpose of habitation, with 2no. roof lights and all associated ancillary site works. / 0.0 km away / 09 June 2020Granted
- FW24A/0228Planning permission is sought / 0.1 km away / 09 July 2024Granted
- FW23A/0301The development will consist of the construction / 0.1 km away / 27 November 2023Granted
- FW24A/0394EConversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear. / 0.1 km away / 13 November 2024Granted
- FW25A/0147EPlanning permission is sought for new attic conversion, raising of gable end to change roof profile with dormer projecting window to rear of existing house for study/playroom use, also 2 no. Velux windows to front roof and all associated site works. / 0.1 km away / 27 May 2025Granted