GrantedDecided 27 August 2020Fingal County Council

FW20B/0080: Two storey extension to rear of property.

25 Park Villas, Castleknock, Dublin 15
DecisionGrant permission
Decided27 August 2020
Application typePermission
Source documents6

Site

What is on file

0refusal reasons8conditions8nearby records

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Fingal is in progress.

Conditions

  • 1Development must be carried out in accordance with lodged plans, particulars, and specifications.Compliance
  • 2External finishes must harmonise in colour and texture with the existing premises.Design Materials
  • 3Premises must be used as a single dwelling unit, apart from exempted development.Occupancy
  • 4Measures must prevent spillage/deposit of materials on adjoining roads; developer responsible for full cost of road repair.Construction Management
  • 5No surface water/rainwater discharge into foul system. Surface water drainage must comply with Greater Dublin Regional Code of Practice for Drainage Works (Version 6.0, April 2006).Wastewater Drainage
  • 6All public services (electrical, telephone cables) must be located underground throughout the site.Water Services
  • 7Bathroom and en-suite rooms must be fitted with permanently maintained obscure glass; film is not acceptable.Design Materials
  • 8Working hours restricted to 08:00-19:00 Mon-Fri, 08:00-14:00 Sat, none Sun/public holidays unless prior written approval obtained.Construction Management

Planning a project near 25 Park Villas, Castleknock, Dublin 15?

Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Full reasons for every nearby decision are in the site report →