FW21A/0249: Retention of development which consist of; (1) change of use of part of ground floor from light industrial warehouse use to office use, (2) creation of a new first floor area above existing ground floor light industrial warehouse floor space for office use and (3) revised office layout on first floor.
230, Blanchardstown Corporate Park, Blanchardstown, Ballycoolin, Dubli
DecisionGrant permission for retention
Decided14 February 2022
Application typeRetention
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / F05522178DAC11ECBA3884C5A689FE30.pdf / Document 771177Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / F05522198DAC11ECBA3884C5A689FE30.pdf / Document 823019Source PDF
- Final GrantSource: planningapi.agileapplications.ie / 32299CC9AC6111EC92B984C5A68ABD3E.pdf / Document 748234Source PDF
- Planners ReportSource: planningapi.agileapplications.ie / C7FCD56CB02011EC9F4CD81265958418.pdf / Document 766079Source PDF
- ReportsSource: planningapi.agileapplications.ie / E15AF47C85C211EC8655005056926BDB.docx / Document 822432Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW21A/0041Retention for (1) change of use & revised internal layout of a ground floor from warehouse to office use, () Addition of first floor for office use including stair, (3) addition of mezzanine level for office use, including stair and (4) alterations to Elevations. AI received 16/06/21 / 0.1 km away / 06 July 2021Granted
- FW18A/0017Elevational Changes including reduction in height and increase in floo / 0.1 km away / 27 March 2018Granted
- FW15A/0151Four storey office building with rooftop plant and associated car and / 0.1 km away / 27 January 2016Granted
- FW19A/00071) retention of previously completed internal fit-out works at first f / 0.2 km away / 11 April 2019Granted
- FW22A/0235The proposed development will conist of (i) Installation of solar photovoltaic panels and associated fixtures and fittings on the roof of the exisiting commercial building, and (ii) All other associated infrastructure and site developement works. / 0.2 km away / 24 November 2022Granted
- FW23A/0084The proposed development consists of the following: / 0.2 km away / 24 July 2023Granted
- FW24A/0538EProvision of 1 no. self-illuminated external sign, located at roof parapet level to the North-West elevation of Plaza 255, Blanchardstown Corporate Park 2, Ballycoolin, Dublin 15 / 0.2 km away / 18 February 2025Granted
- FW22A/0309The development will consist of the provision of 2 No. 4 storey office buildings(with rooftop plant setback from building edge) over basement level, having a total Gross Floor area of c. 6,693 sqm. The development will also include 2 No. new vehicular entrances and 2 No. pedestrian/cyclist entrances connecting to the internal road network within Blanchardstown Corporate Park 2; 175 No. car parking spaces at basement and surface levels (including 2 No. accessible spaces and 26 No. EV spaces with charging points); bicycle parking including shelters (c. 84 sqm); ESB substation (c. 21.8 sq m); hard and soft landscaping, including the provision of a public plaza; boundary treatments; changes in levels; signage; external lighting; piped infrastructure and ducting;SuDS; waste management;pedestrian footpaths; PV panels and all ancillary site excavation and development works above and below ground. The lands are generally bounded by the N2/N3 Link Road to the west, undeveloped lands to the north and the internal road network within the Blanchardstown Corporate Park 2 to the south-west and south-east. AI received 08/03/23 / 0.2 km away / 04 April 2023Granted