37 Meadow Copse, Hartstown, Dublin 15
Planning application FW21B/0142
DecisionGrant permission
Decided12 October 2021
Application typePermission
Source documents6
Site
What is on file
0refusal reasons7conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be carried out in accordance with lodged plans, particulars and specifications.Compliance
- 2Premises to be used as a single dwelling unit only.Occupancy
- 3Finishes to match submitted drawings unless agreed in writing.Design Materials
- 4No surface water to foul system; drainage to comply with Greater Dublin Regional Code of Practice.Wastewater Drainage
- 5Construction hours restricted to 0800-1900 Mon-Fri, 0800-1400 Sat. No work on Sundays/Bank Holidays.Construction Management
- 6Service cables (electrical, TV, telephone, lighting) to be run underground within the site.Other
- 7Prevent spillage/debris on adjoining roads. Developer responsible for full cost of repair to adjoining public road.Construction Management
Planning a project near 37 Meadow Copse, Hartstown, Dublin 15?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 26 pages of searchable text on file.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 4 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
6 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0248Permission for first floor extension to rear. 2no dormers to front roo / 0.0 km away / 01 December 2022Granted
- FW23B/0037For permission for development at 27 Meadow Copse, Hartstown, Dublin 1 / 0.0 km away / 29 August 2023Granted
- FW25A/0094Development will consist of a proposed new ground floor / 0.0 km away / 29 April 2025Granted
- FW26A/0113Permission for a first floor extension to the rear of the existing / 0.1 km away / 12 May 2026Granted
- FW21B/0033The development will consist of an attic conversion with a dormer to t / 0.1 km away / 29 April 2021Granted
- FW11B/0059Retention permission of three sky lights(3) on front elevation of roof / 0.1 km away / 14 September 2011Granted
- FW24A/0355EPlanning permission at 16 Beechwood Close, Clonsilla, Dublin 15 / 0.1 km away / 18 October 2024Granted
- FW17A/0024Construction of 3 no. 2 storey terraced three bedroom houses, new / 0.2 km away / 28 April 2017Granted