Planning application FW22A/0011
DecisionGrant permission
Decided23 March 2022
Application typePermission
Source documents9
Site
What is on file
0refusal reasons6conditions8nearby records
Proposed development
Application description published by Fingal County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
No refusal reason is on record for this application yet.
Conditions
- 1Development to be constructed in accordance with lodged plans, particulars and specifications.Compliance
- 2No surface water/rainwater to discharge into foul system. Surface water drainage to comply with Greater Dublin Regional Code of Practice for Drainage Works Version 6.0.Wastewater Drainage
- 3All services (electrical, telephone cables, equipment) to be located underground throughout the entire site.Water Services
- 4Construction hours restricted (Mon-Fri 8am-7pm, Sat 8am-1pm, no Sun/Bank Holidays). Noise, dust, and air emission controls required. Dust limit 350mg/m2/day.Construction Management
- 5Noise mitigation per Allegro Acoustics report. Cumulative noise not to exceed 55dB(A) LAeq 30min (08:00-22:00) and 45dB(A) LAeq 15min (other times). Generator testing max 55dB LAeq. Monitoring required.Other
- 6Prevent spillage/deposit of materials on adjoining roads. Developer responsible for full cost of repair for any damage to adjoining public road.Construction Management
Planning a project near Block 5, Blanchardstown Corporate Park 1, Dublin 15, Dublin, D15 PY54?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.Inside the decision file
Extracts from the council's own decision documents for this application — 35 pages of searchable text on file.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Read the full decision filePro members can search and read every indexed page of this file with the AI research assistant — planner's reasoning, conditions, and precedent across 5 documents.
Source documents
Original council portal records and source PDFs where available.Included in site brief
9 council documents — in the €39 site risk brief
Site brief
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/01162.4m and partially 3m tall security railing inside the sites northern / 0.0 km away / 24 October 2022Granted
- FW15A/0050Permission for a (i) New ESB substation (28.3 m2 ), transformer compo / 0.0 km away / 09 June 2015Granted
- FW13A/0140Permission for a ground and first floor extension to the existing / 0.1 km away / 18 February 2014Granted
- FW19A/0060The construction of a local support facility 'Wellness Centre' compris / 0.1 km away / 31 May 2019Granted
- FW22A/0055The development will consist of / 0.2 km away / 29 September 2022Granted
- FW20A/0153Permission for development consisting of: the construction of 2 no. of / 0.2 km away / 15 March 2021Granted
- FW22A/0246General upgrades of the existing external site area to include A) New / 0.2 km away / 05 December 2022Granted
- FW21A/0117Modifications to a previously permitted development (Reg Ref. F00A/129 / 0.2 km away / 19 August 2021Granted