FW23A/0259: The development will consist of the following:
Site N8, Horizon Logistics Park, Harristown, St. Margarets, Swords, Co
DecisionGrant permission
Decided23 October 2023
Application typePermission
Source documents4
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Site N8, Horizon Logistics Park, Harristown, St. Margarets, Swords, Co?
Get the precedent report for this site: every grant and refusal within 5 km, and the planners' reasons. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW23A_0259_CE.pdf / Document 892556Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW23A_0259.pdf / Document 897280Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW23A-0259_Transportation.pdf / Document 888820Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW22A/0260A) Provision of an internal ESB substation and switch room within the previously granted Unit(N8), Reg Ref: FW20A/0187, (b) 1no. 10.075 metres diameter, 9.67 metres high sprinkler tank and single storey 30m2 pump room, (c) 1 no. metal clad plant enclosure over 3 storeys 27x8x13.5m high, situated to rear if the unit, (d) 2 no ancillary metal clad plant enclosures, 3m high each, situated to side and rear of the unit, (e) Minor elevational changes to allow for ESB & exit doors, (f) Minor alterations to existing car park area - no change to existing numbers, all of the above to include associated site services works on an application area of 4.680 acres. / 0.0 km away / 20 December 2022Granted
- F18A/0457Permission for the construction of 1 no. warehouse/logistics building / 0.1 km away / 25 September 2018Granted
- FW20A/0025Three illuminated 'Bunzl' identity signs and various other non-illuminated locational and directional signs. / 0.1 km away / 04 June 2020Granted
- FW20A/0187The proposed development consists of the following: The construction of 8 no. light industrial/warehouse (including wholesale use) / logistics units including ancillary office use and entrance/reception areas over two levels, with maximum height of c. 15.5 m and combined total gross floor area (GFA) of 39,732 sq.m. (units N1-N8); The demolition of 2 no. existing agricultural sheds and the construction of a link road (Estate Road No. 4), extending south from the proposed development to connect with existing road infrastructure (Sillogue Green); The implementation of a new internal road network with all access points, internal access roads and footpaths, service yards and access roads, cycle paths and landscaping; The construction of 2 no. new roundabouts on Estate Road No. 4, the construction of Estate Road No. 3 branching west and the extension of Estate Road No. 2 which currently serves Horizon Logistics Park; The development includes 2 no. ESB substation buildings and switchrooms (with a combined GFA of 68 sq.m.), service yards including loading bays, bin storage areas and a total of 395 no. car parking spaces, 8 no. motorcycle parking spaces and 202 no. cycle parking spaces; The proposal includes landscaping and planting, boundary treatment, lighting, security fencing and all associated site services and development works including underground foul and storm water drainage network and sustainable urban drainage systems, all on a site of 14.64 hectares. A Natura Impact Statement will be submitted to the Planning Authority with the planning application. AI received 20/04/21 AI deemed significant 22/04/21 Revised notices received 30/04/21 / 0.2 km away / 23 June 2021Granted
- F17A/0768The development will consist of a further extension (3,623m²) to a pre / 0.2 km away / 23 February 2018Granted
- FW23A/0278A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the NIS will be available for inspection or purchase for a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority We, HPREF Dublin Office DevCo 1 Limited, intend to apply for planning permission for development at Horizon Logistics Park (known as Site G1), off the R108, at the townlands of Silloge and Harristown, St. Margaret's, Swords, Co. Dublin. The proposed development is located to the east of the development permitted under Reg. Ref.: FW20A/0187 (known as the Site N development), and to the southwest of the Harristown Bus Depot. The proposed development consists of the following: o The construction of 1 no. light industrial / warehouse (including wholesale use) / logistics building (Unit G1) with a gross floor area (GFA) of c. 4,203 sq.m (including 656 sq.m of ancillary welfare and office space over two levels). The proposed building will have a main parapet height of c. 14.8 metres. o Provision of 44 no. car parking spaces (including 3 no. disabled parking spaces and 5 no. electrical vehicle parking spaces), 44 no. bicycle parking spaces within bicycle shelter structures, and 5 no. motorcycle spaces; o Provision of an ESB substation (with a GA of c. 35.75 sq.m) to the southeast of the main building. • Provision of a service yard and loading bays to the east of the main building, bound by a 2.4m high fence. Provision of a recycling and bin store to the south of the service yard. Provision of access arrangements to the proposed development including an access from the estate road to the west of the site and provision of new cycle and pedestrian path alongside the estate road. Provision of landscaping and amenity space to the north and east of the site, planting, and boundary treatments. The proposal includes signage zones, PV panel zones at roof level, building plant, site lighting, security fencing, and all associated site services and development works, including underground foul and storm water drainage network and sustainable urban drainage systems / 0.2 km away / 10 November 2023Granted
- F17A/0240The development will consist of the extension (3,582m²) to a previousl / 0.3 km away / 21 June 2017Granted
- FW22A/0036The installation of a photovoltaic solar array to be mounted on the rooftop of an existing industrial building. The proposed development includes the provision of approximately 6245m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure. / 0.3 km away / 07 April 2022Granted