FW24A/0010: The application site is bound by
Site E, Kilshane View, Northwest Logistics Park, Ballycoolin, Dublin 1
DecisionGrant permission
Decided14 May 2024
Application typePermission
Source documents12
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal is in progress.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0010_D.pdf / Document 908964Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24a.0010_CE.pdf / Document 1033907Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0010_CE.pdf / Document 908963Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW24A_0010_FG.pdf / Document 1040359Source PDF
- ReportsSource: planningapi.agileapplications.ie / 00116085_E00177ZF_20240117_1248.pdf / Document 903875Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A0010_WS.pdf / Document 906899Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A-0010_Uisce_Eireann.pdf / Document 907165Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_0010_DAA.pdf / Document 907472Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0010_Transport.pdf / Document 907864Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0010_Parks.pdf / Document 908408Source PDF
- ReportsSource: planningapi.agileapplications.ie / FW24A_-_0010_Parks.pdf / Document 908951Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW18A/0074The development will consist of a two storey building (1340 sqm) with / 0.1 km away / 09 October 2018Granted
- FW23A/0045The proposed development will comprise of the following development / works: - Change of use of 528 sq.m of warehouse / logistics floor space at ground floor level, and associated internal reconfiguration, to provide for ancillary office floorspace and welfare facilities; - Provision of a second floor level to provide an additional 406 sq.m of ancillary office floorspace and welfare facilities, and an associated office roof plant area above (within the existing building envelope); - Extension of the existing stair core 1 by one floor level to provide access to the proposed second floor level and extension of the existing stair core 2 by two floor levels to provide access to the proposed second floor level and the associated office roof plant area; - Alterations to the building elevations, including: - Additional row of strip glazing and increase of the existing wrap around curtain wall glazing by 4m at the main entrance to the proposed second floor level on the north and west elevation; - Provision of additional windows to the proposed second floor level on the north and west elevation; - Provision of an additional staff access door at ground floor level on the south elevation; - Additional vents to the existing and proposed stair core extensions on the north elevation; and - All associated site works The application site is bound by Kilshane way to the south and Kilshane View to the North. / 0.1 km away / 24 April 2023Granted
- FW20A/0102The proposed development consists of the construction of 1 no. warehouse/logistics/light industrial unit (proposed Unit 637), including ancillary office floorspace over two levels, with a maximum height of c.17.09 m and a total GFA of 10,901 sq.m. The proposal includes two vehicular access points (staff/visitors and service) off the existing road network serving the Logistics Park. The proposal includes 109 no. car parking spaces and 20 no. cycle parking spaces. The development also includes 1 no. ESB substation, 1 no. sprinkler pumphouse, signage zones for the unit, PV panels at roof level, HGV service yard areas, landscaping, boundary treatments, entrance gates, lighting, and all associated site works including underground foul and storm water drainage network and attenuation areas. / 0.1 km away / 25 August 2020Granted
- FW25A/0541EFull planning permission for site alterations, which comprises the installation of a cardboard compactor, 2x bollards, alterations to the van dock ramp, a fence and an associated secure gate to enclose the cycle storage, and a guard hut (1.96sqm) / 0.2 km away / 12 February 2026Granted
- F06A/0368/E1Development to consist of 2 blocks, containing a 6 storey hotel, inclu / 0.2 km away / 04 May 2011Granted
- FW24A/0295EPlease see attached documents for a full description: Planning permission for two single storey units to be used for the ancillary servicing and maintenance of vehicles. / 0.2 km away / 10 September 2024Granted
- FW22A/005611 x non-illuminated woodmark signs on the eastern elevation, 1 x non-illuminated woodmark sign on the southern elevation and 2 x non-illuminated woodmark signs on the western elevations, together with 14 no. non-illuminated directional signs across the site. The application site is bounded by Ratoath Road to the west, Kilshane View to the south and Kilshane Avenue to the east. / 0.2 km away / 10 May 2022Granted
- FW21A/0112Permission for the completion and retention of alterations to a development permitted under Reg. Ref: FW20A/0190. The Application site is bounded by Ratoath Road to the west, Kilshane View to the south and Kilshane Avenue to the east. The alterations, for which permission for completion and retention is sought, comprise of the following: (1) Internal alterations to permitted Unit 638 to raise the finished floor level of the first floor level by 1.8 metres, to 6 metres above ground level. (2) Associated external alterations including relocation of windows on all elevations, omission of windows on the south and east elevation, addition of a window on the east elevation, provision of a van dock canopy on the east elevation, addition of a door on the south elevation and dock doors increased to 4m on the east elevation, parapet height raised by c. 2m on part of the south elevation, adjustments to facade panelling on all elevations. (3) Omission of rooflights at roof level. (4)Alterations to the permitted ESB substation/switchroom including an increase in GFA of 38 sq. and associated external modifications. (5) Relocation of 1 no. power module and provision of screened plant enclosure. (6) Provision of paladin fencing to enclose the HGV service yard internally within the site; and all associated and ancillary works. / 0.2 km away / 09 August 2021Granted