FW24A/0013: The application for retention consists of modifications to the permitted entry area and guardhouse (gfa45.67 sqm & max height 4.275m) in relation to orientation and design. Other minor modifications to car parking and landscaping are also included. The development will also include amendment to permission Ref. FW17A/0167 and permission Ref. FW18A/0114 to include the works subject to retention. AI rcvd 05/04/2024
Orion Business Park, North West Business Park, Ballycoolin, Dublin 15,
DecisionGrant permission for retention
Decided01 May 2024
Application typeRetention
Source documents6
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Fingal has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on planning.agileapplications.ieSource portal
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0013_D.pdf / Document 1031390Source PDF
- Notification Of DecisionSource: planningapi.agileapplications.ie / FW24A_0013_D.pdf / Document 922673Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0013_CE.pdf / Document 1031424Source PDF
- Chief Executives OrderSource: planningapi.agileapplications.ie / FW24A_0013_CE.pdf / Document 922672Source PDF
- Final GrantSource: planningapi.agileapplications.ie / FW24A_0013_FG.pdf / Document 1038125Source PDF
Nearby precedent
Similar nearby applications linked to this planning decision.- FW11A/0017Retention and Completion of two existing ESB MV Substations and associ / 0.0 km away / 13 April 2011Granted
- FW22A/0168The development will consist of modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works) and permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works). the proposed modifications will relate to the first phase of the permitted development which encompasses Building No. 1, Energy Centre No. 1, the main site entrance, internal access roads, ancillary infrastructure, 35 no. car parking spaces and 24 no. bicycle spaces. The proposes modifications will comprise the following; Revised internal layout of building No. 1 with associated elevational changes including but not limited to material alterations, alteration of door locations, alteration of louver locations, alteration to the loading bay area and addition of canopies to the front and rear of the building; The provision of Solar PV Panels to the roof of the administration building; Additional roof penetrations; Alteration to the size, orientation and design of the seurity/guard house building no. 1; Alteration to the car park, entrance and access roads within the site, relocation of 4 no. motorbike parking spaces and addition of 1 no. additional space (total 5), provision of 4 no. EV charging points (with ducting provided for a further 14 no. future charging points). Alteration to the location and design of the gas metering skid, pump house and sprinkler water tank; Modification to the landscaping, perimeter fencing and entrance gates; Modification to the location and design of the GNI compound and its separate vehicle entrance along the southern boundary; and All associated site development works, landscape works and service provision. The gross floor area of Building No. 1 decreased to 12,153.63 spm and the total gross floor area of the proposed development revised to 39.802.87 sqm. The proposed modifications to the first phase of the development will also include alteration to the energy centre for building no. 1 for a temporary period of c. 3.5 years. The temporary modifications within the generator yard include; Installation of 4 no. gas powered generators and 4 no. bio diesel (HVO) generators (including biodiesel storage) used in standby applications; Each generator will include a 12m tall flue stack; 2 no. Battery Storage area and a Battery inverter station; and Installation of 6 no. containerised switch gear rooms and 8 no. transformers; Installation of a n ESB substation(Max 500K Va) for a temporary period of c. 3.5 years is also proposed to the south of the generator yard. the temporary modifications will replace the permitted layout for the temporary period. Following the temporary period, the energy centre including the generator yard will return to the layout and design as permitted by FW18A/0114. The temporary works will be removed once Building 2 & 3 have been commissioned. The remainder of the development to be carried out in accordance with parent permission Reg. Ref. FW17A/0167 and Amendment permission FW18A/0114. / 0.1 km away / 27 September 2022Granted
- FW18A/0114Modifications to permission Ref. FW17A/0167 (for demolition of existin / 0.1 km away / 21 September 2018Granted
- FW17A/0167The development will comprise the following / 0.1 km away / 31 January 2018Granted
- F05A/0962/E1Development of 22,486 sq m approximately of mixed use logistics, offic / 0.1 km away / 25 April 2013Granted
- FW24A/0246EThe application for planning permission consists of modifications to permission Ref. FW17A/0167 (for demolition of existing warehouse and construction of 3 no. data centres and associated works) and permission Ref. FW18A/0114 (Amendments to the permitted 3 no. data centres and associated works). The proposed modifications will comprise the following: Revised layout of Plant Yard No. 1 to provide a new gas pressure reduction station (GPRS), revised Energy Centre, modifications to permitted flue design, and alteration of HV Building to MV building and revised design; Revised layout of Plant Yard No. 2 to provide revised Energy Centre, modifications to permitted flue design, fuel storage tanks, and combined services building; Revised layout of Plant Yard No. 3 to provide revised Energy Centre, modifications to permitted flue design, and alteration of HV Building to MV building and revised design, new battery energy storage system (BESS); Modifications to internal access and landscape areas to accommodate redesigned Plant Yards; Ancillary infrastructure including revised sprinkler tank and pumphouse location; Minor modifications to rear loading of Buildings No. 1, 2 and 3; and All associated works ancillary to the modifications. The proposed modifications will also include a temporary energy generation compound for a period of c. 1.5 year. The temporary modifications include: Installation of 4 no. gas powered generators and 4 no. bio diesel (HVO) generators (including biodiesel storage) used in standby application; Each generator will include a 12 m tall flue stack; 2 no. Battery Storage area and a Battery inverter station; Installation of 6 no. containerised switchgear rooms and 6 no. Transformers; and ancillary equipment including fuel interceptor. Following the temporary period, Data Centre building No. 2 will be developed in accordance with the layout and design as permitted by FW18A/0114 including the modifications proposed in this application. The temporary works will be removed once Energy Centre No. 1 and 2 have been commissioned. The remainder of the development is to be carried out in accordance with parent permission Reg Ref. FW17A/0167, Amendment permission FW18A/0114, and any subsequent amendments permitted by this application for planning permission. / 0.2 km away / 24 July 2024Granted
- FW14A/0055Permission for a change of use and associated site works to the existi / 0.2 km away / 24 June 2014Granted
- FW24A/0012The application for retention consists of construction of a new 500KVA substation (gfa of 30.1 sqm & max height of 3.2 m) and back-up generator. The development will also include amendement to permission Ref. FW17A/0167 and permission Ref. FW18A/0114 to include the works subject to retention. / 0.2 km away / 29 February 2024Granted