Maoilín, Ballymoneen Road, Ballyburke
Planning application 1737
DecisionUnconditional grant
Decided04 April 2017
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Maoilín, Ballymoneen Road, Ballyburke?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460367Permission for development which consists of; to install a roof light to the front of her dwelling house at 92 Maoilin, Knocknacarra, Galway / 0.1 km away / 20 January 2025Granted
- 2660131Permission for development which consists of: to install one roof light to the front of his dwelling house / 0.1 km away / 09 June 2026Granted
- 2660130Permission for development which consists of: to install two roof lights to the front of his dwelling house / 0.2 km away / 09 June 2026Granted
- 2660005Permission for development which consists of: to install two roof lights to the front of his dwelling house / 0.2 km away / 11 March 2026Granted
- 2660003Permission for development which consists of: We, Cairn Homes Properties Limited, intend to apply for permission for development of an amendment to the permitted Large Scale Residential (LRD) scheme (Planning Authority Ref 2460270 / An Coimisiún Pleanála Ref 321970), and as amended by PL Ref 2560285, located to the west of Ballymoneen Road (L5024) in the townlands of Keeraun (An Caorán) and Ballynahown East (Baile na hAbhann Thoir), Galway. The proposed amendment the subject of this application is located in the southern portion of the site, in the townland of Ballynahown East (Baile na hAbhann Thoir). The development will consist of; 1. An amendment to the permitted finished floor levels for 89 no. residential units and ancillary facilities which were previously permitted under PL Ref 2460270 / ACP Ref 321970, and as amended by PL Ref 2560285 including; a. 45 no. houses b. 44 no. apartments and a creche facility located within the apartment block to the south of the site. 2. Modification to the boundary treatments and ramp access along the southern boundary of the subject site, and all associated site development works. The footprint of the permitted units remains the same as what was permitted under Pl Ref 2460270 / ACP Ref 321970 / 0.2 km away / 06 March 2026Granted
- 2560358Permission for development which consists of: a new part two storey/part single storey Cuan na Gaillimhe primary school to an existing greenfield site around proposed courtyard with new pedestrian access from Ballyburke road and both pedestrian/vehicular access from existing Colaiste na Coribe access road with on-site drop-off, parking, ballcourt, hard & soft landscaping, drainage, external plant, signage and all related works at existing site / 0.2 km away / 12 May 2026Granted
- 18335Permission for alterations to existing bin store, and permission to complete works to bin store including new roof and all associated works / 0.3 km away / 23 April 2019Granted
- 2460412Permission for development which consists of to expand creche capacity from 40 to 48 children, within the existing building footprint / 0.3 km away / 19 February 2025Granted