1 Hy-Brasil Court, Circular Road, Galway
Planning application 1982
DecisionConditional grant
Decided14 May 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 1 Hy-Brasil Court, Circular Road, Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 172Permission for retention of development within the curtilage of dwelling including greenhouse, steeltech shed and garage at side/rear of dwelling and alterations/extensions to dwelling including conversion of attached garage to living accommodation, extension to rear and additional door at side of dwelling, and associated ancillary works / 0.2 km away / 02 March 2017Granted
- 18199Permission for the construction of 68 residential units (9 no. 1 Bed, 33 no. 2 Bed and 26 no. 3 Bed) in two separate schemes with new road access onto Gaelcarrig Park and Carn Ard and all associated site works / 0.2 km away / 25 April 2019Granted
- 21145Permission for development which will consist of the construction of an ESB Substation and associated site works within a previously granted residential development (Pl. Ref. 18/199) accessed from Gaelcarrig Park and Carn Ard / 0.2 km away / 29 June 2021Granted
- 1933Permission and outline Planning Permission is sought for development which consists of 8 no. new dwelling houses in total: On Site A: full planning permission for new access road & services to 5 no serviced residential sites, these are comprised of: 1 no. Full permission new dwelling house (527m2) & Shed (37m2) all associated site services & landscaping works, & Outline permission for 4 no. dwelling houses with sheds on these serviced sites. On Site B: full planning permission for new access road & services to 3 no. serviced residential sites, these are comprised of 1 no. Full permission new dwelling house (445m2) & Shed (37m2) all associated site services and landscaping works, & Outline permission for 2 no. dwelling houses with sheds on these serviced sites / 0.3 km away / 09 April 2019Granted
- 2215Permission for retention which will consist of (a) Retaining single storey extension to the rear (b) Demolish existing single storey sheds (c) Construct a 2-storey side extension and alterations to existing dwelling house and all ancillary site works / 0.3 km away / 22 March 2022Granted
- 19202Planning Permission is being sought for the construction of a single storey extension to the rear and side of their existing house and to construct a front porch and all associated site works. The development will also consist of the demolition of an existing shed all / 0.3 km away / 03 October 2019Granted
- 2660050Permission for development which consists of: 1) Construct new pitched roof over redesigned front bay window and flat roof over front sunroom. 2) Modifications to front facade along with new window openings to side and rear elevations. 3) Replace existing tiles to main roof and fit new roof light. along with all associated site works / 0.3 km away / 15 April 2026Granted