Ballybane Industrial Estate, Tuam Road, Galway
Planning application 2212
DecisionConditional grant
Decided22 March 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballybane Industrial Estate, Tuam Road, Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2660020Permission for development which consists of: Planning Permission for the retention of alterations and changes to Unit 18, Glenrock Business Park for use as warehousing /storage, distribution, retail of a type and scale appropriate to the area, offices /specialist offices, light industry and all other uses compatible with CI Zoned lands The Alterations and Changes to be retained are as follows: 1) Glazed Front Entrance Porch on South-West Elevation of Unit 18 2) Ground Floor Single Story Extension (Ancillary Office Space) to North-West Elevation of Unit 18 3) Roller Shutter Door and Canopy Roof over loading area to North-East Elevation of Unit 18 4) Signage to South-West Elevation of Unit 18 5) Minor elevational changes to those approved under Pl. Ref: 05/715 6) All ancillary Site Works and Site Services / 0.1 km away / 24 March 2026Granted
- 2560191Permission for development which consists of: to retain a building as constructed. The works to be retained include the following: • The change of use of part of the ground floor from warehouse to office use, • The provision of a mezzanine floor for office use, • To change the use of the first floor from storage to office use. • Provision of a ventilation grill to the front elevation / 0.1 km away / 22 August 2025Granted
- 19210Planning Permission for the development will consist of the following and all associated site works and services: Basement level: Re- arrangement of existing car parking to include Electric Car Charging Points. Inclusion of Motor bike parking and bicycle parking bays. Ground level: 4 No. Bin stores at ground level. 1 No. Bicycle lift shaft from Ground to Basement and 1 No. Goods/Bicycle lift from Ground to Basement, Level 01 & Level 02. Extension to Existing Office Entrance. Relocation of existing double door to Retail Unit 'A'. RE- arrangement of existing car parking to include Electric Car Charging Points. Erection of flag poles within the landscaped area adjacent the Tuam Road. Level 01: Change of Use from Industrial to Medical Clinic Use (998m2). Change of Use from Wholesale Retail to Specialist Offices (3368.7m2). Additional carparking at the Ballybane estate road side of the building to include Electric Car Charging Points and landscaping. Level 02: Construction of a new floor for Specialist Offices (4378.7m2) Roof Plans: Construction of PV/Solar Panels to the roof plan area. Elevations: Modifications to the glazing on the Northeast, Southeast,Southwest Elevations. Signage to the Southwest & Southeast Elevations. New Fire Escape doors off Stairwells to Southwest & Northeast elevations / 0.1 km away / 24 October 2019Granted
- 18419Permission for (i) The demolition of parts of the existing warehouse building 'Building No. 38' Ballybane Industrial Estate (located between the North Point Development and the junction of the Tuam Road and Bóthar Na Mine) (ii) And the associated changes caused by the above alterations to the new elevational treatment previously granted under PD16/126 consisting of the provision of new cladding and glazing arrangements roller doors and signage (iii) The construction of a single storey commercial unit consisting of office space, kitchen, toilets, storage & circulation spaces to the South West of the retained building with connections to services and all other associated site works and services. (iv) The construction of 2Nr.Wash pads with associated canopies with connections to services. (v) The installation of building signage and totems, together with all connections to services and all other ancillary site works / 0.1 km away / 07 February 2019Granted
- 19161Planning permission for: (i) The demolition of parts of the existing warehouse building "Building No. 38" ( located between the North Point Development and the junction of the Tuam road and Bothar Na Mine) in addition to demolition granted under PD18/419, (ii) and the associated changes caused by above alterations to the new elevational treatment previously granted under PD18/419, consisting of, the provision of new cladding and glazing arrangements, roller doors and signage and additional cladding and elevational changes to parts of southeast and southwest elevations (iii) The construction of a single storey commercial unit consisting of office space, kitchen, toilets, storage and circulation spaces to the south west of the retained building with connections to services and all other associated site works and services / 0.1 km away / 31 July 2019Granted
- 19288Permission for Development which will consist of a change of use of the property to a warehouse with ancillary trade counters (for the sale of building related products principally to trade): external changes including the conversion of the current staff entrance to a goods in entrance and construction of a service ramp: conversion of the current, roller shuttered, delivery entrance to an access servicing the trade counters, marking out parking and delivery area and any other ancillary works to facilitate the development / 0.2 km away / 04 December 2019Granted
- 18347Permission for the erection of a warehouse building and the erection of a link structure between the proposed warehouse building and an existing retail building. The proposed development also includes for the erection of a link structure between 2 no. existing warehouse buildings all / 0.2 km away / 03 January 2019Granted
- 18338Permission for a 10 year planning permission for development. The proposed development comprises 3 no, office blocks and a café (c. 17,433sq. m GFA including basement and plant rooms) as follows: Block 1 (c. 10,225 sq. m) is an 8-storey office building providing offices, stair and lift cores and plant rooms. Block 2 (c. 4,081 sq. m) is a 6-storey office building over basement comprising stair and lift cores and plant rooms. Block 3 (c. 2,995 sq. m) is a 5-storey office building over basement comprising stair and lift cores and plant rooms. The Café (c. 77sq. m) is a single storey building which incorporates a seating area, storage area and toilets. The development includes a surface car parking accommodating 421 no car spaces and 120 no. cycle spaces. Vehicular access is provided from Bóthar Na Mine and the city East Ballybrit Business Park Road incorporating anew internal access road. The proposed development includes for the provision of 2 no. ESB substations and also includes for the full and partial demolition of existing buildings and structures on the site (c.2,614 sq.m), as well as all associated site development works, boundary treatments, landscaping and connection to existing services / 0.2 km away / 10 April 2019Granted