University Hospital Galway, Newcastle Road, Galway
Planning application 2357
DecisionConditional grant
Decided19 April 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near University Hospital Galway, Newcastle Road, Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2383Permission for development which consists of the following: Retention of an existing single storey Temporary Emergency Department (TED) building with plant room overhead (Gross Floor Area 1,384 sq.m) and associated alterations to internal Campus access road and parking layout. Retention of car park comprising 24 no. spaces adjacent to public analysts lab. The provision of a single storey Electrical Energy Centre (Gross Floor Area 281 sq.m) including transformer and LV switchgear all located on the east side of the campus and the provision of associated site lighting. The provision of the Electrical Energy Centre building will require alterations to the existing car park adjacent to Newcastle Park, comprising the creation of a new vehicular entrance to the car park, relocation to entrance barrier, alterations to boundary wall and railings and ticketing system and reconfiguration of the remaining parking layout. All other associated site development works and services necessary to facilitate the proposed development / 0.0 km away / 23 May 2023Granted
- 2360127Permission for development which consists of the construction of – • A two-storey extension to the east of the entrance of main hospital concourse building (Gross Floor Area 90 sqm), providing suitable accommodation for UHG Security and UHG carpark admin, including public parking pay area, and • All associated site development works / 0.1 km away / 25 January 2024Granted
- 1724Permission for development which will consist of: Partial demolition and alteration of the existing mortuary facility and existing Pathology laboratory building. The area to be demolished is a former viewing area and no longer in use for that purpose; Associated site works which include reconfiguration of the internal hospital road and services; New entrance to the mortuary; Construction on the site of a new two storey Hospital Laboratory building with rooftop plant enclosures and small single-storey extension to the mortuary. The proposed building will accommodate the Blood and Tissue Establishment in a purpose-built infrastructure which operates within the defined acceptance criteria of the EU Directives. The development will also provide accommodation on one of the floors for the configuration of an integrated Medical Laboratory service / 0.1 km away / 22 March 2017Granted
- 22287Permission for development which consists of the demolition of a red brick chimney (circa 24m tall with an area of 10.2sqm and base dimensions of 3.2m x 3.2m) which is in a state of disrepair. The works will also further consist of the erection of replacement boiler flues, and supporting steelwork terminating circa 3m above the roof of an adjacent boiler house and associated works / 0.1 km away / 19 December 2022Granted
- 2660082Permission for development which consists of: We, Health Service Executive (West), intend to apply for permission for development at University Hospital Galway, Newcastle Rd, Galway, H91 YR71. The development will consist of the construction of a new CT building comprising of 1 no. storey plus rooftop plant room with connection to the existing hospital link corridor, to facilitate the relocation of existing services. The proposed building comprises of a 206 sq.m gross floor area building. The building will comprise of: (i) ground floor level – CT scan room, control room and ancillary support rooms, (ii) roof level - enclosed plant room and screened plant area. Planning permission is also sought for site drainage and all other associated and ancillary works. Access is via the main hospital campus which is accessed from Newcastle Road, University Hospital Galway, Co. Galway. / 0.1 km away / 05 May 2026Granted
- 18421Permission for development which will consist of the construction of a new 2 storey extension plus alterations to existing elevations and associated site works / 0.2 km away / 07 February 2019Granted
- 17213Permission for development on a 0.99 hectare site within a campus of approx. 16.75 hectares at University Hospital Galway, which will consist of amendments to the link corridor aspect of the planning permission granted for the proposed radiation oncology centre, Galway City Council Register 14/334, and will comprise the following; increase in the site area for the development from approximately 0.9 hectares, to approximately 0.99 hectares; demolition of a single storey prefabricated building, 105 sqm, located at the north west of the ward block; relocation of the east part of the proposed pedestrian link to connect into the main hospital block at the rear entrance; addition of a plant room, 102 sqm, at first floor and an overall increase in floor area of the proposed pedestrian corridor link from 240 sqm to 557 sqm; revised elevation treatment and changes in level and parapet height for the proposed pedestrian corridor link; modifications to the road layout and traffic barrier location to facilitate ambulance patient transfer and general deliveries in to the rear of the hospital; modifications to the layout of the carpark east of paediatrics to provide a single access and egress point and a reduction in the number of parking spaces from 43 to 34; internal rearrangement of rooms at the south east and north west of the radiation oncology building at ground floor to facilitate the provision of a low voltage switch room along with external access and associated minor elevational modifications; amendments to the location of the permitted foul drainage connection point for the Radiation Oncology Centre within the hospital campus; amendments to the surface water drainage proposals and hard and soft landscaping proposals arising from the proposed rearrangement of the link / 0.2 km away / 13 September 2017Granted
- 20222EOD on Pl. Reg. Ref. 14/334 Permission for development on a 0.9ha site on an overall campus of approximately 16.75ha which will consist of the demolition of the existing Psychiatric Unit and existing link corridor to the Paediatric Unit (3,000sqm) and the construction of a 3 No. storey Radiation Oncology centre (8,058 sqm total gross floorspace) and an enclosed single storey pedestrian ground floor level link (382 sqm gross floorspace) connecting both the existing ward block to the east and the existing Paediatric Unit to the west to the proposed Radiation Oncology centre, and associated elevational alterations. The development will also consist of the following works: reconfiguration of an existing public car park to the north of the proposed building (43 No. existing car spaces maintained); provision of a new patient car park west of the proposed building to provide 38 No. new car parking spaces (including 3 No. accessible spaces), access/egress barriers and associated set-down area; bicycle parking; provision of a new vehicular and pedestrian access/egress point from the internal hospital perimeter road to the building and new car park; provision of a service area to the north of the proposed building (accessed via the existing road from the internal hospital perimeter road to the east of the building); provision of screened plant at Ground Floor Level (external to the north of the building) and Second Floor Level; installation of a 'totem'-style free standing double-sided painted aluminium sign (1.2m wide by 3m high); provision of solar panels at Roof Level; associated lighting; alterations to existing site services (water supply and foul and surface water drainage) and provision of Sustainable Urban Drainage systems; changes in levels; associated hard and soft landscaping and all other associated site excavation and site development works above and below ground / 0.2 km away / 07 October 2020Granted