Unit 203 Balybrit Business Park, Ballybrit, Galway
Planning application 2460130
DecisionConditional grant
Decided18 June 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway City Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway City has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit 203 Balybrit Business Park, Ballybrit, Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560026Permission for development which consists of; changes to the side elevation as granted under planning reference 24/60130: (1) Change the fenestration and lower the side windows, (2) Remove a ground floor window and a first floor window, (3) Change two ground floor windows to fire escape doors, (4) Remove the proposed roller shutter door on the side of the existing unit and, (5) Carry out all ancillary site works. / 0.0 km away / 20 March 2025Granted
- 23164Permission for development which consists of to demolish the existing dwelling house and to construct a single block of 6 No. Residential Units, comprising of 1 No. 1-Bedroom + 2 No. 2-Bedroom ground floor apartments and 3 No. 2-Bedroom Duplex Units at first and second floor levels, including all ancillary site services / 0.1 km away / 10 August 2023Granted
- 1810Permission for development which will consist of: the construction of a new twelve bay 110kV Gas Insulated Switchgear (GIS) building located entirely within the southern portion of the existing Galway 110kV Substation. The proposed GIS building will measure approximately 700 sq.m. with a height of approximately 15 meters; associated development includes: the replacement of three existing 110kV Overhead Line Towers within the substation with three Line Cable Interface Masts (LCIM) proximate to the existing towers to facilitate access of existing transmission circuits to the proposed GIS building by means of underground cables; provision of a temporary internal access route, and vehicular access gate at the south-eastern boundary of the existing substation site to facilitate construction activities. This internal access route and gate will be removed and the substation boundary reinstated upon completion of the development; improvements to the existing vehicular access arrangements on the south-western boundary of the existing substation, in particular reducing the total number of existing vehicular entrances from two to one at this location; associated boundary treatment to the existing south-eastern, southern and south-western substation boundaries, in particular the construction of a new 3m high wall along these boundaries; all associated and ancillary development and site works including provision and/or replacement of electrical equipment, drainage works, laying of new or replacement cables and the diversion of existing cables / 0.2 km away / 12 July 2018Granted
- 2460018Permission for development which consists of internal alterations of existing church and prayer center / 0.2 km away / 20 March 2024Granted
- 22328Permission for development which consists of the installation of 32 no. solar panels on a steel frame ( covering an area of c. 62sqm to a maximum height of 4.2sqm above ground level ). Works to consist of all ancillary development works, including steel columns / 0.2 km away / 15 February 2023Granted
- 23224Permission for development which consists of to extend and renovate an existing dwelling house. The works will include: 1. The construction of an extension to the side of the existing dwelling 2. To carry out internal and external renovations to the existing dwelling along with all associated site works / 0.3 km away / 21 November 2023Granted
- 18338Permission for a 10 year planning permission for development. The proposed development comprises 3 no, office blocks and a café (c. 17,433sq. m GFA including basement and plant rooms) as follows: Block 1 (c. 10,225 sq. m) is an 8-storey office building providing offices, stair and lift cores and plant rooms. Block 2 (c. 4,081 sq. m) is a 6-storey office building over basement comprising stair and lift cores and plant rooms. Block 3 (c. 2,995 sq. m) is a 5-storey office building over basement comprising stair and lift cores and plant rooms. The Café (c. 77sq. m) is a single storey building which incorporates a seating area, storage area and toilets. The development includes a surface car parking accommodating 421 no car spaces and 120 no. cycle spaces. Vehicular access is provided from Bóthar Na Mine and the city East Ballybrit Business Park Road incorporating anew internal access road. The proposed development includes for the provision of 2 no. ESB substations and also includes for the full and partial demolition of existing buildings and structures on the site (c.2,614 sq.m), as well as all associated site development works, boundary treatments, landscaping and connection to existing services / 0.3 km away / 10 April 2019Granted
- 2351Permission for development which consists of the construction of a new transformer compound, modifications to existing utility buildings, and associated site works, to the rear of Building 1 / 0.3 km away / 19 April 2023Granted