GrantedDecided 26 September 2025Galway City Council

Gort Ard House, Rockbarton North, Salthill Galway

Planning application 2560056
DecisionConditional grant
Decided26 September 2025
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Galway City Council.
Permission for development which consists of: the refurbishment and extension of existing 3 storey (2 storey over basement level) ‘Gort Ard’ House (A Protected Structure RPS No. 8701) and associated existing 2 storey annex building (total existing GFA approx. 686.7 sq m) to provide for the upgrade of existing facilities and services offered on site including provision for: (a) new student accommodation (16 no. ensuite bedrooms with an overall proposed capacity of 18 no. bed spaces); (b) private residential accommodation for resident Gord Ard House management and guests (4 no. ensuite bed rooms with 4 no. bed spaces); (c) a new oratory; (d) a new multipurpose building; and (e) all ancillary areas and works (total new GFA approx. 1,278.37 sq m). The development works will include: • The demolition of an existing link building (approx. 81 sqm), removal of an external wall planter and partial removal of an existing stone wall to facilitate the new development proposal; • The refurbishment and renovation of ‘Gort Ard’ House (A Protected Structure RPS No. 8701) to include dining space, kitchen and hot press, servery, pantry, hall pantry, staff changing and social area, cleaner store, hall, WCs, storage, cloak room, entrance lobby, lobby, conference room, visitor room, day room, directors office, comms rooms, visitor WC, 1 no. ensuite student bedroom and 4 no. resident bed rooms and all circulation areas across the lower ground floor, upper ground floor and first floor levels (3 storeys). • The refurbishment of the existing annex building to include 9 no. ensuite student bedrooms at lower ground and ground floor level (2 storeys). • A new side extension (predominantly 2 storeys with 3 storey element to accommodate a new lift) linking the newly refurbished Gort Ard house and the Annex building to include 1 no. ensuite student bedroom, lounge, plant room, utility, drying press, accessible WC, washing/laundry area, ironing and laundry area, lobbies, lift and service riser at lower ground floor level. A new oratory at upper ground floor level to including sacristy, confessional box, lobbies, store, lift and service riser. • A new multipurpose building (2 storey) including 2 no. multipurpose rooms, shower facilities and toilets at lower ground floor level and 5 no. ensuite student bedrooms, lobbies and corridors at upper ground floor level. • A new link and extension between the newly refurbished annex building and new multipurpose building (2 storeys). • Primary veh

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Galway City has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Gort Ard House, Rockbarton North, Salthill Galway?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →