Creagh Td,
Planning application 171389
DecisionConditional grant
Decided01 November 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Creagh Td,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211550For development that will consist of an extension to the existing hospital to provide a new 50 bed ward block over two floors including ancillary accommodation and associated circulation routes linking back to the existing hospital. New service road and all associated site development works (gross floor space 4355sqm) / 0.2 km away / 18 October 2021Granted
- 20601For a new switchroom for the enabling works to the future extension of hospital (planning ref: 16/704) at Portiuncula University Hospital, Dunlo Ballinasloe, Co. Galway, H53 T971. The proposed development is for a new single storey rendered switch room (area of switch room 140 sqm) both existing and proposed generators are to be enclosed behind fences and associated site development works for same. Gross floor space of proposed works; 140sqm / 0.2 km away / 14 July 2020Granted
- 2360810For the development consisting of a new modular building for the Outpatients Department including waiting area and link corridor (507 sq metres), an adjacent standalone modular office building (11 sq metres). The gross internal floor area of the buildings is 518 sq metres. A new 54 sqm external covered roof canopy between the main hospital building & the Outpatients Department. Works included drainage works to connect to the existing site services & all ancillary site works / 0.2 km away / 13 September 2023Granted
- 2260955Of a new CT suite and associated rooms and includes the completion of a new build floorspace within the footprint of an existing ground floor undercroft to the west side of the hospital. The project incorporates an associated roof top plant room required to service the new CT suite, the plant room is located at second floor level above the first floor ICU. The works include drainage works to connect to the existing building and all ancillary site works. Gross floor space of work to be retained: 636.00 sqm / 0.2 km away / 15 November 2022Granted
- 2561096For a new Emergency Department extension covering 310 sq metres of single storey extension with rooftop plant room and internal refurbishment of the existing department. At the existing lower ground floor level, a new public entrance lobby with security room will be formed adjacent a reconfigured ambulance drop-off and set-down area. The extension will provide 9 new patient cubicles, including gynaecology treatment room and associated staff and clinical support facilities. The extension will link into the existing building by way of a new accessible reception, leading to a newly formed dedicated paediatric waiting area and WC. The existing emergency department will undergo a series of phased internal refurbishment works to provide modernised staff changing facilities, additional patient treatment cubicles and reconfigured storage and staff support facilities. The works will include a reconfiguration of the existing internal campus 2-way traffic flow to become a 1-way traffic flow in the vicinity of the Emergency Department extension, formation of a new accessible set-down area, reconfigured ambulance drop-off areas and works to form a new pedestrian crossing and improve accessibility and safety around the immediate site. Drainage, water, and electrical utility connections will be made within the campus to the existing site infrastructure, and all other ancillary site works as required to facilitate the project / 0.3 km away / 02 December 2025Granted
- 171385For new flat roof single storey extension to facilitate diagnostic imaging facility and associated site services. Gross floor space of proposed works 99.2sqm. / 0.3 km away / 09 November 2017Granted
- 211101To demolish 32 sq. meters of living area & 6.2 sq meters of an external storage shed. Replacing same with 74.47 sq. meters of living accommodation, inclusive of a utility room & 2 no. bedrooms. / 0.3 km away / 13 August 2021Granted
- 211629For development on this site consisting of the demolition of existing substandard detached 3-bedroom dwelling house and the construction of a four-bedroom detached dwelling house, alterations to existing site entrance and front boundary wall, and all associated site works. Gross floor space of proposed works: 175 sqm (house). Gross floor space of any demolition: 110 sqm / 0.3 km away / 28 October 2021Granted