Ballydonagh,
Planning application 17803
DecisionConditional grant
Decided29 August 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballydonagh,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561903For several minor amendments to the previously consented development under Planning Reference 2361049. The amendments comprise the following; re alignment of the main entrance and access gate; re alignment and widening of internal access tracks; alteration of the boundary fence; removal of the consented 38kV substation in Field 22; combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers; reduction in the size of related hardstanding areas; updated table layout including a reduction in PV table numbers from 3209 to 3120; reduction of the of new overhead line separation areas arising from the removal of a section of the 110 kV overhead line; inclusion of an additional badger sett buffer and amendment of condition 3a to extend the operational lifetime of the solar farm from 35 years to 40 years. An updated Natura Impact Statement has been submitted with this application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply / 0.3 km away / 20 February 2026Granted
- 2361049For the development that will consist of a planning permission for a period of 10 years to construct & complete a Solar PV Energy development with a total site area of circa 81.9 hectares, to include, solar PV panels ground mounted on support structures, electrical transformer & inverter station modules, a substation, temporary construction compounds, internal access tracks, watercourse crossing infrastructure, security fencing, electrical cabling & ducting, interconnection cabling, CCTV & other ancillary infrastructure, drainage, additional landscaping & habitat enhancement as required & associated site development works. The solar farm would be operational for 35 years. A Natura Impact Statement will be submitted with this application / 0.3 km away / 27 August 2024Granted
- 211112For 2 storey extension to front, side and rear of existing house, comprising of kitchen/lounge facility with additional 3 no. bedrooms on first floor, permission also south to upgrade septic tank to treatment system with new percolation area and all associated site works. Gross floor space of proposed works: 92sqm / 1.2 km away / 16 August 2021Granted
- 2660009For several minor amendments to the previously consented development under Planning Reference 2461749 (by Galway County Council). The amendments comprise the following; Combined central inverters and MV transformers are replaced by separate string inverters and central MV transformers which results in a reduction in the extent of associated hardstanding areas; alteration to Condition 3(a) to extend the operational lifetime of the solar farm from 35 years to 40 years; addition of tables in the former central inverter locations. An updated Natura Impact Statement has been submitted with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply / 1.3 km away / 04 March 2026Granted
- 2461749To construct and complete a Solar PV Energy development with a total site area of circa 56.2 hectares across four sections of land to include, solar PV panels ground mounted on metal support structures, electrical transformer and inverter substation modules, temporary construction compounds, internal access tracks (existing, upgrading and new), site accesses, watercourse crossing infrastructure, security fencing, electrical cabling and ducting, interconnection cabling, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works. The solar farm would be operational for 35 years. A Natura Impact Statement will be submitted with this application / 1.3 km away / 27 May 2025Granted
- 20921For the following: (a) Construction of cubicle shed (b) Construction and Modifications to existing livestock buildings to include the addition of cubicles, feed area and slatted flow channel. (c) Construction of a milking parlour, dairy & ancillary rooms, livestock waiting yard, handling facilities and underground slatted flow channel. (d) Construction of a machinery shed. (e) Construction of geomembrane lined slurry lagoon (f)Construction of 2 no. silage pits and all associated site works. Gross floor space of proposed works: 2220 sqm (F-H & 12) / 1.3 km away / 25 January 2021Granted
- 2685Of planning reference 211790, to construct milking parlour building incorporating holding yard with crush/drafting yard, meal bin, office, slatted tank, water tank, storage rooms, office and plant room, cubicle shed with slatted tanks and loose area, hardcore area, (IV) silage slab and all assorted site works. Gross floor space of proposed works: 2218 sqm / 1.3 km away / 11 June 2026Granted
- 211790To construct (I) milking parlour building incorporating holding yard with crush/drafting yard, meal bin, office, slatted tank, water tank, storage rooms, office and plant room, (II) cubicle shed with slatted tanks and loose area, (III) hardcore area, (IV) silage slab and all assorted site works. Gross floor space of proposed works: 2218 sqm / 1.3 km away / 22 November 2021Granted