Droim na Gaoithe (Lakeview),
Planning application 191667
DecisionConditional grant
Decided13 December 2019
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Droim na Gaoithe (Lakeview),?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181547Of change of use for Unit 8 from Light Industrial to office space as constructed. Permission is also sought for change of use of Unit 9 from Light Industrial to office space to include any associated site development works and services as required. Gross floor space of proposed works 744 sqm. Gross floor space of work to be retained 418 sqm. / 0.0 km away / 02 January 2019Granted
- 21436Development will consist of 1) the construction of a new building, comprised of warehouse.2) 2 no. ancillary loading bays and enclosed services yard. 3) a first floor link corridor connecting applicant's existing facility in unit 6 with the adjacent unit 7. 4) works also include the fit out of units 7 & 8b to provide reception, canteen, welfare facilities, production and storage areas, internalised sub-station and switch room at ground level and ancillary office and meeting rooms on a newly constructed first floor mezzanine level. 5)proposed amendments to the existing elevations of 6,7 &8b to include the localized inclusion and reconfiguration of glazing, personnel doors and vehicular access with the provision of signage.6) reconfiguration of car parking spaces, the provision of secure bicycle parking spaces and drop-off/loading bay area.7) all associated site works. Gross floor space of proposed works: 1502.3 sqm / 0.0 km away / 28 October 2021Granted
- 212001To construction of an extension to existing warehouse for storage along with site works and parking with connection to existing services. Gross floor space of proposed works: 398 sqm / 0.1 km away / 05 April 2022Granted
- 201749To carry out works to an existing warehouse unit. This will include the construction of a mezzanine floor to provide office space and staff services. Permission is also sought to provide windows in the front elevation. Gross floor space of proposed works: 71.4 sqm / 0.1 km away / 20 January 2021Granted
- 19528To construct a mezzanine floor and to retain changes to elevations at Unit 25A. Gross floor space of proposed works: 163.1 sqm / 0.1 km away / 30 May 2019Granted
- 18520For the erection of 5 no. 49 sqm. pre-fabricated temporary classroom buildings with connections to services and all other associated site works. Gross floor space of proposed works 245 sqm. / 0.2 km away / 19 June 2018Granted
- 17472For development at Coláiste Bhaile Chláir, Baile Chláir, Co. na Gaillilmhe, roll number 76233C. The Development will consist of a new temporary single storey 6-classroom 307 sqm. Post Primary School building including all associated site works and landscaping in the location of the existing school building ball courts. (Gross floor space of proposed works: 307 sqm.) / 0.2 km away / 12 July 2017Granted
- 2655For the construction of an extension to existing warehouse, to include associated office space, along with site works with connection to existing services. Gross floor space of proposed works: 245.3 sqm / 0.2 km away / 29 April 2026Granted