Attibrassil,
Planning application 19815
DecisionRefused
Decided18 February 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Attibrassil,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 24201To (a) construct a new dwelling house with garage, (b) new waste water treatment system and (c) to retain the hardstand access road with stone and chippings as constructed with temporary portacabin at rear for storage and all associated site works. Gross floor space of proposed works: 257.00 sqm (house) & 98.00 sqm (garage). Gross floor space of work to be retained: 28.00 sqm + 1,892.00 sqm / 2.4 km away / 10 September 2024Refused
- 201258To construct a slatted shed with calf creep area and ancillary concrete and a new entrance. Gross floor space of proposed works; 319sqm / 2.4 km away / 29 October 2020Refused
- 22649To replace a 12m high wooden pole with an 18m high telecommunications monopole together with antennas, dishes and associated telecommunications equipment. / 2.6 km away / 13 July 2022Refused
- 2561691For the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The development is a renewable energy development which is covered by the provisions of the Renewable Energy Directive III. The development will consist of the following: Demolition and site clearance works including the removal of an existing shed and adjacent hard standing areas and tank structure, located centrally on the site. Construction of 2 no. primary digesters, a pump house, and 2 no. post digester tanks, located in the northwestern section of the site. Construction of 2 no. prepits, a pasteurisation buffer tank, and a pasteurisation unit, located to south of the primary digesters, within the western section of the site. Construction of a digestate storage tank located centrally on site, to the southeast of the primary and post digester tanks. Construction of a digestate treatment building and a feedstock reception building with an odour abatement system, located in the southwestern section of site. Construction of combined heat and power (CHP) unit, a biogas boiler, a backup boiler, and a gas treatment system, located in the southeast section of the site. Construction of a CO2 liquefactor and an emergency/ safety flare a grid injection unit, a fuel storage tank and a propane tank compound accommodating 2 no. propane tanks, located in the southern section of the site. Construction of roofed silage clamps located centrally on site. Construction of a two storey office building and an ESB substation within the eastern section of the site, adjacent to the site entrance. Alterations to the adjacent local road frontage including improved access arrangements and boundary setback to allow for improved access and safety. Associated and ancillary works including parking (8 no. standard, 3 no. EV and 1 no. accessible parking spaces and bike storage for 12 no. bikes), a weighbridge, solar PV arrays at roof level, wastewater treatment equipment, bunding and surface treatments, attenuation pond, boundary treatments, lighting, services, drainage, landscaping, and all associated and ancillary works. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted with this planning application. An EPA-Industrial Emissions Directive (IE) licence will be applied for to facilitate the operation of the proposed development. This development is covered by the provis / 3.3 km away / 21 January 2026Refused
- 181351To construct a dwelling house with a domestic garage attached, to install a treatment system and percolation area and to upgrade the existing water connection to the Clontuskert Group Water Scheme from agricultural to domestic and all associated site works. Gross floor space of proposed works, 258sqm. / 3.5 km away / 16 November 2018Refused
- 22690For dwelling house, wastewater treatment system, percolation bed and associated services. Gross floor space of proposed works 118.7 sqm. / 3.7 km away / 20 July 2022Refused
- 2554Of a mobile home and permission to construct a fully serviced private dwelling house with waste water treatment system and private garage/store to include all associated site works. Gross floor space of proposed works: (H) 51.22 sqm & (G) 53.94 sqm. Gross floor space of work to be retained: 38.69 sqm / 3.9 km away / 20 May 2025Refused
- 19406For the provision of an outdoor activity area for recreational use and for all ancillary structures and landscaping. Permission is also sought for the provision of a reception cabin, storage shed, chemical toilets, car park area, access road, site entrance and for all other ancillary site works associated with the development. Gross floor space of proposed works: 12.7 sqm / 4.2 km away / 14 May 2019Refused