Polkeen,
Planning application 19985
DecisionConditional grant
Decided13 March 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Polkeen,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2260701To install a freestanding 6x3m Portakabin to the North side of site. Gross floor area of proposed works:18 sqm. / 0.3 km away / 31 August 2022Granted
- 2260675To retain dwelling house on revised site boundaries, and permission is also sought to upgrade the existing foulwater treatment system. Gross floor space of works ro be retained 111.00sqm. / 0.4 km away / 28 October 2022Granted
- 191839For development at Twomileditch quarry. The development will consist of an aggregate storage shed (area 980m2) on a 0.098 hectare site within the existing quarry landholding. Gross floor space of proposed works: 980 sqm / 0.4 km away / 28 January 2020Granted
- 20753For Buildings No. 1, 2, 3 and 4 in the existing warehouse facility at Pollkeen Townland, Ballybrit, Galway, at the premises of SSL in the IDA Business and Technology Park, Parkmore West, Co. Galway for the following works: 1: Additional total floor area of 386.5 sqm comprising of 173 sqm (storage) and 151 sqm (storage) at first floor level and 62.5 sqm at second floor level. b. Building 2: Additional total floor area of 124.1 sqm comprising of 30.9 sqm (office) and 46.6 sqm (storage) at first floor level and 46.6 sqm (storage) at second floor level. c. Building 3: Additional total floor area of 913 sqm comprising of 23 sqm (storage) and 497 sqm (storage) at first floor level and 393 sqm (storage) at second floor level with modifications to the elevations. d. Building 4: Additional floor area of 1528 sqm comprising of 37 sqm (new loading bay) and 610 sqm (offices, storage & welfare facilities) at first floor level and 881 sqm (storage) at second floor level with additional modifications to the elevations. e. All ancillary and/or associated site development works and landscaping that are completed. Gross floor space of work to be retained: 2951.60 sqm / 0.4 km away / 05 November 2020Granted
- 211445For the construction of a new warehouse building to include for Warehouse Storage Space, Transit Bond, Loading and Unloading facilities, Meeting Rooms, Staff Rooms, WC's. Offices, Reception with External logo signage on selected elevations having a total floor area of 11,387.2 sqm comprising of the following: - Ground Floor - 6578.6 sqm - First Floor level - 2357.3 sqm - Second Floor level - 2451.3 sqm - The building footprint will include warehouse spaces, transit bond, loading, meeting room, staff rooms, WC's, Offices, Reception, and an External elevation logo signage etc. - Construction of a new 32 sqm ESB MV sub-station and all other service and ancillary site infrastructure required to operate the premises. -Construction of a 19m long (66sqm) Link bridge connecting the existing facility to the proposed new facility on the 1st Floor. - The provision of a new public lighting scheme in the vicinity of the proposed building, a building mounted CCTV system, new car parking facilities, hard and soft landscaping to the remainder of the site area, boundary treatments; Drainage infrastructure and connections to services/utilities; Relocation of the existing ESB power lines and the construction of a new EXB MV sub-station along with all other associated and ancillary development works above and below ground level that are required to complete the project to the required standards and regulations. Gross floor space of proposed works is 11,387.2 sqm / 0.5 km away / 14 April 2022Granted
- 17936To extend the existing warehouse facility, at the premises of SSL in the IDA Business and Technology Park. The proposed development will consist of the provision of additional warehouse space with an area of 2156.2sqm, provision of car parking facilities at the development totaling 69 no. car parking spaces, including 2 disabled spaces with associated public lighting, provision of new building-mounted advertising signage with an area of 15.6sqm, provision of 6 no. building mounted floodlights (focused downwards), provision of 4 no. CCTV cameras to security standard requirements, along with all associated ancillary works and site development works required to complete. Gross floor space 2156.2m2 / 0.5 km away / 08 December 2017Granted
- 21472Construction of a new slatted shed with loose bedded area, cattle handling facility and all associated ancillary concrete works. Gross floor space of proposed works 433.05sqm. / 0.5 km away / 19 May 2021Granted
- 18550For construction of a single storey extension to the rear of existing single storey house, demolition and rebuild of garage, new sewage treatment system and all associated site works. Gross floor space of proposed works 115 sqm. / 0.5 km away / 22 June 2018Granted