Tir an Fhia,
Planning application 21209
DecisionUnconditional grant
Decided13 April 2021
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tir an Fhia,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 23397For the demolition of an existing building & for the installation of an all-weather soft play area (both previously granted under permission number 15/1085) & for an extension & alterations to the existing school associated together with parking, covered walkway & front boundary alteration. A protected structure, NIAH Reference Number 30409015 - Letter Box is located within the curtilage of this site. No works are proposed to this Protected Structure / 0.0 km away / 24 September 2024Granted
- 19274Chun teach cónaithe, gáráiste agus córas séarachais a thógáil. Spás urláir comhlán na n-oibreacha beartaithe: 254 sqm / 0.3 km away / 24 April 2019Granted
- 181776For the development of (i) a new treated water storage tank, (ii) a new weather-proof enclosure to house low-lift pumps and local control panel, (iii) a new weather-proof enclosure to house an emergency power generator, fuel storage and integral bund, (iv) ancillary site development works and (v) associated temporary site development works, including a temporary compound area for the construction period. Gross floor space of proposed works: 268 sqm. Gross floor space of work to be retained: 146.1 sqm / 0.3 km away / 13 February 2019Granted
- 2561544Le haghaidh umar nua seirbhíse uisce chóireáilte os cionn na talún a bhfuil toilleadh stórála 620m3 aige a bheidh 8.35m (7.25m gan ráillí sábháilteachta) ar airde iomlán ina mbeidh: a) umar coincréite; b) dé-urrann; c) píbobair cheangail; d) píbobair sciúrtha agus forsceite; e) seomra díchlóirínithe; f) lámhráille agus staighre rochtana; (ii) 2 chaidéal nua aistrithe stórála ísealardaithe (ar dualgas/ar fuireachas) le cur isteach laistigh d’fhoirgneamh an ICU reatha; (iii) 1 imfhálú nua uiscedhíonach (5.7m x 3.9m x 2.7m) ina gcuirfear 3 chaidéal líonra ard-ardaithe (ar Dualgas/Cúnta/ar Fuireachas) agus painéal rialaithe; (iv) 1 imfhálú nua gineadóra cumhachta éigeandála (3.5m x 2.7m x 1.8m), stóráil breosla agus bunda lárnach san áireamh, chomh maith le painéal rialaithe athraithe uathoibríoch; (v) Oibreacha coimhdeacha, an méid seo a leanas ina measc: a) oibreacha talún gaolmhara; b) bealach rochtana feithiclí, geata slándála, cosáin, agus limistéar casta feithiclí; c) seomra díchlóirínithe faoi thalamh; d) ceangail seirbhíse mheicniúla leictreacha; e) mionathruithe ar an gcóras leictreach agus rialaithe reatha chun tacú le hoibreacha nua; f) sconsa ard timpeall ar láithreán an ICU reatha; (vi) an t-umar uisce cúlchaise reatha a bhaint agus an phíbobair ghaolmhar cheangail a dhíchoimisiúnú; (vii) 16 phainéal gréine fhótavoltacha le cur ar leac dhíon an umair stórála nua (statach agus a bhfuil a n-aghaidheanna siar ó dheas); (viii) oibreacha sealadacha gaolmhara, limistéar sealadach compúin san áireamh i rith na tréimhse tógála; (ix) oibreacha gaolmhara, tírdhreachú agus glanbhreisiú bithéagsúlachta san áireamh / 0.3 km away / 04 December 2025Granted
- 17174Le h-aghaidh theach cónaithe, garaiste, seirbhisi agus coras coireala Kinspan Enviromental a thógail. (Spás urláir comhlán na n-oibreacha beartaithe: 236 + 45: 281 sqm.) / 0.6 km away / 16 June 2017Granted
- 201831Ar fhoirgneamh uile-úsáideach atá ar an suíomh faoi láthair, maraon le comharthaíocht atá ann, athruithe airde agus suimh stórala ag taobh an fhoirgnimh atá ar theorainneacha suímhe athcheartaithe, agus iarrtar cead athrú a chur ar ardaithe agus ar leagan amach inmheánach atá ann agus iarrtar cead painéil ghréine maraon le gach seirbhís gaolmahr a chur ar fail. Spás urláir comhlán na hoibre atá le coinneáil: 13.66 msq / 0.7 km away / 03 February 2021Granted
- 211022D'athrú úsaíde ar chuid d'aonad atá ann cheana féin ó úsaídThion scalaíoch Éadron go húsaíd Oideachais ( 180.22 sqm) & oibreacha suímhg gaolmhara ar fad ag Tír an Fhia, Leitri Móir, co. na Gaillimhe. / 0.7 km away / 20 January 2022Granted
- 191587To construct a serviced dwellinghouse, domestic garage and treatment system (gross floor space 228.69 sqm). Previous Planning Ref: 14/517 / 0.7 km away / 04 December 2019Granted