Barrettspark,
Planning application 221006
DecisionConditional grant
Decided26 January 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barrettspark,?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181883For a ten-year planning permission for the development of an up to 100MW Battery Energy Storage Facility that will provide energy services to the national grid and will be delivered in 4 no. phases. The development will consist of the construction and operation of up to 34 metal containers to store up to a project total of up to 100MW in sealed battery cells each with entrances, fire suppression systems, heating, ventilation and air conditioning systems. The proposed development includes for inverters, control systems, other electrical components, security lighting and ancillary infrastructure and all associated works including security fencing and ancillary grid infrastructure. Gross floor space of proposed works: 2186.6 sqm / 0.3 km away / 21 June 2019Granted
- 24260For the installation of solar panels over the roof of an existing telecommunications cabin on a steel frame (covering an area of 60 sqm to maximum height of 5 meters above ground level) works to consist of all ancillary development works, including steel uprights / 0.3 km away / 24 October 2024Granted
- 2360948& retention permission for development at C&F Tooling, Cashla, Athenry, County Galway. Retention planning permission for the following extensions to the existing C&F Tooling premises: • machine shop & canteen (gross floor area - 792m2) • switch room & compressor room (gross floor area - 96 m2) •maintenance garage & stores gross floor area - 673 m2) • monitoring office building (gross floor area - 444 m2) • steel cleaning shop (gross floor area - 62.3 m2) • store (gross floor area - 20.3 m2) • machine shop (gross floor area - 4,065 m2). In addition to the above, retention permission for the existing component storage area (external) (approx. 1.54 Ha in area). Planning permission for: • upgraded surface water drainage system & associated works, •relocation of existing traffic barrier at the existing vehicular entrance to the premises, • new vehicular staff entrance on the western boundary of the site, & • alterations to the existing staff car park to provide 357no. car parking spaces to include the provision of EV charging & accessible car parking bays, • provision of visitor car park to provide 31no. car parking spaces (including EV charging & accessible car parking bays). The proposed development includes for all associated site development works & landscaping / 0.3 km away / 26 June 2024Granted
- 19325To refill an existing disused quarry with inert material / 0.3 km away / 23 July 2019Granted
- 2560220For continued use of the existing quarry to the permitted depth of minus 5 mOD, including drill-ing, blasting, crushing, processing, stockpiling of materials, associated roads and ancillary services (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of open storage areas; Continued use of existing permitted concrete manufacturing facility (granted under Planning Ref. File No. 09230 and 19/517: ABP-304769-19); Continued use of the existing office (granted under Planning Ref. File No.: 09/1958 and ABP Ref.: PL07.235821); Continued use of the existing maintenance shed (granted under Planning Ref. File No. 09610); Continued use of the existing water management system (including settlement lagoons), weighbridge and wheelwash; Lateral extension of the existing permitted quarry area over a previously permitted extraction area (granted under Planning Ref. File No. 06/4125) of c.4.6 ha. area to a final floor level of minus 5 mOD. The total quarry extraction area will be c. 13 Ha.; Restoration of the application area to natural habitat after uses following completion of ex-traction. The proposed development is within an overall application area of c. 27.5 hectares and is for a total period of 22 years (comprising an operational period of 20 years followed by 2 years for restoration). This application is accompanied by an Environmental Impact Assessment Report (EIAR) / 0.7 km away / 28 April 2025Granted
- 21859To continue quarrying with associated roads and ancillary services and to operate a concrete batching plant and a bitumen batching plant within the quarry. The 13 hectare extraction area and the 27.5 hectare site boundary remains identical to that outlined in the existing quarry planning permission for Coshla Quarries Ltd (P06/4125). An Environment Impact Statement (EIS) will be submitted with the application / 0.7 km away / 07 September 2021Granted
- 20499For a twenty year planning permission for the continued operation of the existing quarry and all associated uses and activities, as well as for an extension to the existing quarry extraction area and all associated site works including landscaping arrangements. The proposed quarry extraction area extension is on lands to the north, south and east of the existing quarry and the additional extraction area amounts to approximately 6.7 hectares. The application is accompanied by an Environmental Impact Assessment Report and a Natura Impact Statement. / 0.7 km away / 08 October 2020Granted
- 19517Of development consisting of a concrete batching plant, which is an extension to an existing concrete batching plant permitted under Pl. Ref. No: 09/230, and includes for associated structures and hardstanding areas. Gross floor space of work to be retained: 38 sqm / 0.8 km away / 30 May 2019Granted