GrantedDecided 30 November 2022Galway County Council

Boleybeg East, Boleybeg East Townland Barna, Co Galway

Planning application 2261018
DecisionConditional grant
Decided30 November 2022
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Galway County Council.
For revisions to previously approved planning grant Pl. Ref. No. 18/1476 for a two storey dwelling; modifications include the the addition of a small porch to the front (3.63sqm) at ground floor and the addition area of 14.72sqm to the rear at first floor level of the dwelling; the total area of the proposed dwelling is now 188.77sqm; relocating the house a further 3m from the boundary to the north, it will now be 7m from this boundary; reducing the overall height of the dwelling from ground floor to ridge to 8m; very minor changes to the elevations of dwelling. Permission for new garage 24.54sqm located to the rear of the site and all associated site works.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Galway has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Boleybeg East, Boleybeg East Townland Barna, Co Galway?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →