Lisduneen, Ballycrissan, Ballinasloe
Planning application 23483
DecisionConditional grant
Decided13 February 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Lisduneen, Ballycrissan, Ballinasloe?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 25286For alterations to a previously permitted extension (parent permission 54935), permission to construct a new single storey extension to the side (north elevation) of an existing detached dormer dwelling, permission to retain a mobile home for use as a domestic storage unit and all associated site works / 0.6 km away / 13 March 2026Granted
- 191594To construct a new dwelling house, domestic garage, septic tank/treatment unit with percolation area and all associated site works. Gross floor space of proposed works: House - 228.2 sqm, Garage - 69.5 sqm / 0.7 km away / 09 March 2020Granted
- 2360207To amend the design of the approved development (planning reference 16/1500) which comprises consent for a solar PV energy development. Proposed amendments include; (1) addition of 2no. transformer stations, (2) 2no. control buildings to be replaced by a customer substation, (3) removal of CCTV cameras, (4) minor changes to the panel layout, (5) MW output to be decreased from 5MW to 4MW, (6) change in height & number of module racks & pile driven poles & (7) project lifetime proposed to be extended from 25 to 35 years. Gross floor space of proposed works: 85.97 sqm / 0.8 km away / 18 September 2023Granted
- 21950For a solar farm development. The development will consist of (1) a solar PV panel array on ground mounted steel frames with a maximum export capacity of 5MW within an overall site area of 11.78ha (2) underground cabling/ducting (3) two electricity control buildings (4) temporary construction compound (5) site access including a temporary construction access and track from the L-4302-63 local road (6) boundary fencing and landscaping proposals (7) pole mounted infra red security cameras together with all associated site works and services. / 0.8 km away / 22 July 2021Granted
- 2624Of an existing single storey extension to the side [north elevation] and rear [west elevation] of an existing single storey dwelling with minor alterations to the dwelling to include a pitched roof over the existing porch; permission to decommission the existing septic tank and remove same from site; permission to retain a new wastewater treatment system and percolation area; permission sought to retain an existing domestic garage and all associated site works / 0.9 km away / 30 March 2026Granted
- 25131For the upgrade of an existing effluent treatment system and percolation area together with all associated services / 0.9 km away / 28 July 2025Granted
- 20624Permission for a dwelling house, domestic garage & proprietary treatment system. Gross floor space of proposed area: House 102.85 msq & Garage 60 msq / 0.9 km away / 16 July 2020Granted
- 2261301For the development of a 20kV cable route consisting of c.685m of overhead line supported on wooden poles and c.625m of underground cabling in ducting. This cable route will connect the permitted Ballycrissane Solar Farm (ref 16/1500) to an existing 38kv substation in the village. / 1.0 km away / 23 February 2023Granted