Grange East, Athenry, Co. Galway
Planning application 2361091
DecisionRefused
Decided07 November 2023
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Grange East, Athenry, Co. Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360112And completion of a domestic garage with revisions to the garage design from that previously permitted under pl. ref 14/919 and all associated works, gross floor area of works to be retained 108msq. / 0.0 km away / 05 April 2023Refused
- 2361008For the development that will consist of grid connection infrastructure to connect the approved solar photovoltaic (“PV”) energy development on lands at Ballymoneen & Grange East Co. Galway under register references 20/961 & 22/61105 to the ESB Cashla 220kV Substation, Cashla, Co. Galway comprising the laying of c. 6,610 metres of 110kV underground electricity cables (3no.) & communications cable in ducts (6no.) & associated infrastructure substantially under public roads & under an existing underground gas main by means of horizontal directional drilling / 0.6 km away / 19 October 2023Refused
- 22406To construct and complete a Solar PV Energy development with a total site area of circa 25 hectares, to include electrical transformer and inverter station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabin and ducting. CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works. The solar farm would be operational for 35 years. Gross floor space of proposed works: 768 sqm / 1.1 km away / 05 August 2022Refused
- 2260408For change of house plans to previously permitted planning application 19/472 for construction of new dwelling along with garage, treatment septic tank system and all associated site works. / 1.2 km away / 20 January 2023Refused
- 211572For the construction of a new two-storey dwelling house, a domestic garage, and wastewater treatment system and all associated site works. Gross floor space of proposed works: 224 sqm (house) + 40 sqm (garage) / 1.6 km away / 19 October 2021Refused
- 22397For the construction of a new two-storey dwelling house, a domestic garage, and wastewater treatment system and all associated site works. Gross floor space of proposed works: 288 sqm + 42 sqm (garage) / 1.9 km away / 08 December 2022Refused
- 181756To construct a dwellinghouse, garage and proprietary treatment system. Gross floor space of proposed works: (House) 249.02 sqm, (Garage) 60 sqm / 1.9 km away / 07 February 2019Refused
- 191To construct house, garage and effluent treatment plant. Gross floor space of proposed works: 385 sqm / 2.1 km away / 26 April 2019Refused