Ballydotia West, Belclare, Tuam
Planning application 2361380
DecisionConditional grant
Decided15 March 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballydotia West, Belclare, Tuam?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2261291To construct a two storey extension to the rear of an existing dwelling house, a single storey extension to the side of the dwelling house, internal modifications to existing house layout, new domestic garage and all associated works. Gross floor space of proposed works 139.05sqm / 0.3 km away / 07 June 2023Granted
- 201819For a domestic garage at the side of dwelling house and all associated works; Gross floor space of proposed works; 60sqm garage / 0.3 km away / 03 February 2021Granted
- 2260762Planning permission for the construction of a new extensions to existing dwelling to include new sunroom to replace existing sunroom which is to be demolished, along with new link to garage and amendments to elevations and all associated site works. / 0.4 km away / 19 September 2022Granted
- 17982To construct a dwellinghouse, domestic garage/fuel store, septic tank, treatment system and percolation area and all ancillary site works (gross floor space house 232sqm; garage 60sqm) / 0.4 km away / 25 August 2017Granted
- 181267To construct a dwelling house, wastewater treatment unit, percolation area, domestic garage and all associated site works. Gross floor space of proposed works, 224.10sqm. / 0.6 km away / 07 January 2019Granted
- 181826For construction of extension to side of house incl. all ancillary site development works on lands. Gross floor space of proposed works: 32.30 sqm / 0.6 km away / 22 July 2019Granted
- 214421. Provision of a steel frame and cladding to cover existing aggregate stock bays for environmental purposed.2. the provision of a steel frame and cladding around the existing fixed plant (including lime crusher) for environmental purposed. the proposed development is ancillary to the main quarry which was previously approved under planning reference 06/2275 and An Bord Pleanála reference PL.07.222783. / 0.9 km away / 17 May 2021Granted
- 2560750For continued use of the existing quarry (granted under Planning Ref. File No.: 06/2275 and ABP Ref.: PL07.222783), including drilling, blasting, crushing, processing, and stockpiling of mate-rials within a total site area of 15.09 hectares to the permitted depth of 33m OD. Continued use of existing permitted structures and facilities, including: weighbridge and wheelwash with side and overhead spray bar, office and staff facilities building and carpark provision (Ref. 17512). Asphalt plant (Ref. 15104), concrete batching plant (Ref. 20419), maintenance shed (Ref. 141295), aggregate shed, ESB substation (Ref. 191964), crushing and screening plant, and stock bays (Ref. 062275 & 21442). Associated site infrastructure. Construction of a new quarry storage yard (c. 1.09 Ha.) to the east of the existing quarry. Relocation of the existing permitted sheds (Plan Ref File No. 21442) to an area beside the proposed storage yard area. Importation of soil and stone (both waste and non-waste) for site restoration purposes and selected construction and demolition waste for recycling to preserve natural aggregate re-sources, subject to the necessary authorisations. The proposed development will facilitate the continued operation and restoration of the site, with the operational life of the quarry ceasing upon resource exhaustion, followed by resto-ration to agricultural and natural uses using imported material. The proposed development is within an overall application area of c. 16.3 hectares and is for a total period of 35 years (comprising an operational period of 33 years followed by 2 years for restoration). The application is accompanied by an Environmental Impact Assessment Report (EIAR) / 0.9 km away / 17 December 2025Granted