Emlaghmore, Co. Galway
Planning application 24216
DecisionConditional grant
Decided23 October 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Galway County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Emlaghmore, Co. Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 221176For the development consisting of extraction of rock from an area consisting of 1.9 hectares which was previously subject to rock extraction; Extraction of rock will be undertaken by blasting means down to a level of 36.4 meters ordnance datum; processing of material using mobile crushing and screening plant; All associated ancillary facilities/works; Screening berms and landscaping. The duration of the proposed works is over a 25 year period. The application is accompanied by a Natura Impact Statement (NIS) / 1.1 km away / 15 March 2023Granted
- 211641For a development which consists of the replacement of existing thatch roof with new slate roof and associated site works. / 2.4 km away / 20 January 2022Granted
- 171804For three houses for use as individual self catering units for tourism related accommodation associated with Ballynahinch Castle Hotel and Estate, access road, wastewater treatment system with all associated works and ancillary services. The proposed development is located within the attendant grounds of a protected structure. (gross floor space 666sqm). Previous Planning Reference No. 13/17. / 2.6 km away / 14 February 2018Granted
- 191788At Ballynahinch Castle Tower House, Recorded Monuments GA036-00101 - Tower House located on GA036-00102 - Crannog in Ballynahinch Townland. The development will consist of the re-instatement of a natural slate pitched roof, glazed screens to external openings on internal face and stone floor to the single storey 19th Century Lodge under scholarly restoration and the insertion of a zinc flat roof and stone floor within the late Medieval Tower House by retaining the original ruined character using a policy of minimum intervention. A Natura Impact Statement has been prepared with the application. Gross floor space of work to be retained: 75 sqm / 2.7 km away / 05 November 2020Granted
- 19764For works that have been carried out under the approval of and supervision by the National Monuments Service, Department of Culture, Heritage and the Gaeltacht on Recorded Monuments GA036-00101- Tower House located on GA036-00102- Crannog. The works include the stabilisation and preservation of the structures including removal of vegetation. Some of these works are the subject of Enforcement notice EN15/054. An Appropriate Assessment Screening Report (AASR) has been prepared and accompanies this application / 2.7 km away / 11 July 2019Granted
- 2660226For the re-instatement of a simple gabled stone roof, glazed steel screens within existing openings and insertion of a viewing gallery to the late Medieval Tower House. Recorded Monument (GA036-001001), Recorded Monument (GA036-001002). The subject site is located within the designed landscape of Protected structure Ballynahinch Castle Hotel (RPS: 620). A Natura Impact Statement has been prepared with the application / 2.7 km away / 02 April 2026Granted
- 23186For the construction of a 170 kW photovoltaic ground mounted solar array consisting of 432 Q-Cell 400 watt panels mounted on lightweight galvanised frames on lands north of the existing staff office. The works include the erection of a timber post and rail fence and a 140 meter long underground trench to connect the solar array to the existing above ground plant room. The works are within the curtilage of Ballynahinch Castle Hotel, a Protected Structure / 2.8 km away / 04 July 2023Granted
- 2561323For the construction of an additional floor over the existing 1990’s River Wing to accommodate 4 bedroom suites with private terraces over looking the river and dormer windows within a mansard roof to the courtyard. Access will be formed via an opening through to the guest corridor constructed in 2017 / 2.9 km away / 15 December 2025Granted