Application description published by Galway County Council.
For; (1) a Long Duration Energy Storage (LDES) facility contained within a secure outdoor compound (area of 34,855sqm), (2) a Synchronous Condenser (SC)positioned within a building and located within a second secure outdoor compound (area of 9,716sqm) on lands to the south of the LDES facility, and (3) demolition and removal of an existing dwelling, outhouses and agricultural sheds. The LDES facility comprises: (i) an open area battery energy storage system containing 168no. single storey battery enclosures and 56no. single storey medium voltage power station (MVPS) enclosures, (ii) IPP building, (iii) firewater storage tank, (iv) lightning masts and (v) electrical plant and bunded transformer. The SC facility comprises (i) a SC building, (ii) externally located cooling fans, (iii) firewater storage tank, (iv) lightning masts, (v) ESB rural supply compound, and (vi) bunded transformers and electrical plant. Both the LDES and SC facilities will electrically connect to the 400kV electricity grid using HV underground cables which will route from the respective LDES and SC compounds to a proposed Gas Insulated Switchgear (GIS) substation located adjacent to the ESS development. The proposed GIS associated HV cables and electric plant are the subject of a separate and concurrent strategic infrastructure development (SID) planning application to An Bord Pleanála under Section 182A of the Planning and Development Act 2000 (as amended). The proposed ESS development includes a temporary construction compound, a main entrance connecting to the L8763 public road, improvement works to the L8763 and the junction of the N65/L8763 public roads and all ancillary development including new internal roads, fencing and gates, car parking, lighting, utilities, lightning protection masts, underground services, landscaping and associated engineering works to provide for the connection of site services and foul and surface water management and drainage. The proposed ESS development is also located adjacent to a proposed Reserve Gas-Fired Generator which is the subject of a separate and concurrent SID planning application being made to An Bord Pleanála under Section 37E of the Planning and Development Act 2000 (as amended). Planning permission is being sought for a period of 10 years. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) are included in this application. Gross floor space of proposed works: 1,389.00 sqm and 750 sqm for demolition
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
ABP-320916-24Submitted 26 September 2024 / decided Not recorded
Status not recorded
Appeal submittedAppeal reference ABP-320916-24
26 September 2024
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2460845
Received
08 July 2024
Decided
30 August 2024
FI requested
No
Authority
Galway County Council
Application type
PERMISSION
Outcome
Refused
Source status
Documents indexed. Reason extraction for Galway has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coolpowra Cooldorragha Gortlusky Ballynaheskeragh & Sheeaunrush, Co. Galway, H53 Y997?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.
Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.
Source documents
Original council portal records and source PDFs where available.
Included in site brief
1 council document — in the €39 site risk brief
Refusal reasoning quoted verbatim from the council decision file
Policy citations and the planner's own wording