GrantedDecided 18 November 2025Galway County Council

Shessy North Shessy South Lydacan South, South Galway, Co. Galway

Planning application 2561380
DecisionConditional grant
Decided18 November 2025
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Galway County Council.
For a proposed solar farm development consisting of: linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; 12 no. proposed single storey MV stations; 1 no. Battery Energy Storage System (BESS) installation (including 32 no. containers with cells and 8no. Power Conversion System (PCS) MV Stations) with associated security fencing and gates; Site perimeter fencing; 4 no. new permanent site entrances, 1 no. new temporary site entrance, 1 no. upgrade to an existing site entrance; Security gates at all permanent and temporary access points; Site access tracks including passing and turning bays; 3 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 6 no. steel storage containers; 6 no. turning bays; On-site pole mounted CCTV cameras; 3 no. temporary construction stage Moby Dick type wheel wash systems; 3 no. concrete wash out locations (one within each temporary construction compound); and, all associated and ancillary works. The proposed solar farm development spans a total site area measuring 86.3ha. Permission is sought for a period of 10 years with an operational period of 40 years. The export capacity to the grid is estimated to be up to 70 MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. The planning application including the AASR and NIS

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Galway has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Shessy North Shessy South Lydacan South, South Galway, Co. Galway?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →