Application description published by Galway County Council.
For a proposed solar farm development consisting of: linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting; 12 no. proposed single storey MV stations; 1 no. Battery Energy Storage System (BESS) installation (including 32 no. containers with cells and 8no. Power Conversion System (PCS) MV Stations) with associated security fencing and gates; Site perimeter fencing; 4 no. new permanent site entrances, 1 no. new temporary site entrance, 1 no. upgrade to an existing site entrance; Security gates at all permanent and temporary access points; Site access tracks including passing and turning bays; 3 no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; 6 no. steel storage containers; 6 no. turning bays; On-site pole mounted CCTV cameras; 3 no. temporary construction stage Moby Dick type wheel wash systems; 3 no. concrete wash out locations (one within each temporary construction compound); and, all associated and ancillary works. The proposed solar farm development spans a total site area measuring 86.3ha. Permission is sought for a period of 10 years with an operational period of 40 years. The export capacity to the grid is estimated to be up to 70 MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application. A separate application to obtain permission for a 110kV grid connection and 110kV substation to facilitate the export of power from the solar farm, will be submitted to An Coimisiún Pleanála. The planning application including the AASR and NIS
Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.
PL-500475-GY-25Submitted 15 December 2025 / decided Not recorded
Status not recorded
Appeal submittedAppeal reference PL-500475-GY-25
15 December 2025
No appeal document has been bound to this case yet; the timeline will enrich as indexing continues.
Decision details
Core application dates and identifiers from the public planning record.
Application ref
2561380
Received
24 September 2025
Decided
18 November 2025
FI requested
No
Authority
Galway County Council
Application type
PERMISSION
Outcome
Conditional grant
Source status
Documents indexed. Reason extraction for Galway has not started yet.
Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.
Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Galway has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Shessy North Shessy South Lydacan South, South Galway, Co. Galway?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €39 incl. VAT, PDF by email.
Searching the records is free. A one-off brief for this site is €39, and Pro at €19/month adds full document access and the planning AI for people tracking more than one site.
Source documents
Original council portal records and source PDFs where available.
Included in site brief
1 council document — in the €39 site risk brief
Refusal reasoning quoted verbatim from the council decision file
Policy citations and the planner's own wording
Direct links to the source documents on the council portal