GrantedDecided 10 February 2026Galway County Council

Leitir, Moycullen, Co. Galway

Planning application 2561825
DecisionConditional grant
Decided10 February 2026
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Galway County Council.
(10 mbliana) chun leasuithe ar Chomhdhlúthadán Sioncrónach na nArd-doiriú atá ceadaithe (Uimhir Thagartha Chomhairle Contae na Gaillimhe 23/60641, 24/61485 agus 25/60575) lena n-áirítear lorg coise méadaithe ar an gcampún tógála sealadach, áiseanna foirne le dabhach coinneála fuíolluisce faoi thalamh, nasc cáblaí faoi thalamh athbhreithnithe go dtí an gcampún leictreach 110kV, lorg coise athbhreithnithe ar an gcampún leictreach 110kV, fálú imlíne athbhreithnithe, foirgneamh rialaithe amháin breise le háiseanna leasa agus dabhach coinneála fuíolluisce faoi thalamh, gléasra agus fearas leictreach gaolmhar agus nasc cáblaí faoi thalamh 110kV athbhreithnithe leis an bhfostáisiún Chnoc Raithní atá ann cheana féin. Leasuithe ar nasc eangaí Feirm Ghaoithe Chnoc Raithní atá ann cheana féin (ceadaithe faoi Uimhir Thagartha an Choimisiúin Phleanála PL07.318723), lena n-áirítear bealach cáblaí faoi thalamh (33kV) agus cumarsáide athbhreithnithe chun ceangal leis an gcampún leictreach 110kV nua (lena n-áirítear an rian seirbhíse cábla gaolmhar), agus an síneadh ar Fhostáisiún na nArd-doiriú a fhágáil ar lár. Ullmhaíodh Ráiteas Tionchair Natura (NIS) i ndáil leis an bhforbairt atá beartaithe (10 year) for amendments to the permitted Ardderroo Synchronous Condenser (Galway County Council Reference No. 23/60641, 24/61485 and 25/60575) comprising an increased temporary construction compound footprint, staff facilities with underground wastewater holding tank, revised underground cabling connection to the 110kV electrical compound, a revised footprint of the 110kV electrical compound, revised perimeter fencing, 1 no. additional control building with welfare facilities and an underground wastewater holding tank, associated electrical plant and apparatus and a revised 110kV underground cabling connection to the existing Knockranny substation. Amendments to the Knockranny Wind Farm grid connection (permitted under An Coimisiún Pleanála Reference No. PL07.318723), comprising revised underground electrical (33kV) and communications cabling route to connect to the new 110kV electrical compound (including associated cable service track), and the omission of the extension to the Ardderroo Substation. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Galway has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Leitir, Moycullen, Co. Galway?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →