BALLYNORIG EAST, CAUSEWAY
Planning application 181214
DecisionConditional grant
Decided13 February 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BALLYNORIG EAST, CAUSEWAY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211354CONSTRUCT A FARM MACHINERY SHED, INCLUDING ROLLER DOORS AND ALL ANCILLARY SITE WORKS / 0.4 km away / 28 January 2022Granted
- 17704CONSTRUCT (A) LOOSE CATTLE AND CALF HOUSE AND (B) CONCRETE YARD / 0.6 km away / 13 September 2017Granted
- 22291ERECT A CALF SHED WITH STRAW BED PENS WITH AN UNDERGROUND SEEPAGE TANK ALSO TO CONSTRUCT A DUNG PIT ADJACENT TO SHED ALL ON HIS FARMYARD / 0.8 km away / 09 May 2022Granted
- 2237210 YEAR PLANNING PERMISSION FOR A 100% CARBON NEGATIVE RENEWABLE ENERGY SOLAR PV INSTALLATION CONSISTING OF 2MW OF GROUND MOUNTED SOLAR PANELS AN IMPORVED ENTRANCE AND ALL ASSOCIATED WORKS. THE PURPOSE OF THE INSTALLATION WILL BE TO FEED 100% GREENENERGY TO THE NATIONAL GRID. THE SOLAR INSTALLATION WILL HAVE AN OPERATING LIFE OF C. 40 YEARS. A NATURAL STATMENT WILL BE SMIBITTED WITH THE APPLICATION / 1.4 km away / 25 November 2022Granted
- 21647CHANGE OF USE FROM EXISTING COMMERCIAL USE AS GRANTED UNDER PLANNING REFERENCE 08/2090 TO PROPOSED DOMESTIC GARAGE/SHED USAGE ANCILLARY TO EXISTING DWELLING HOSUE / 1.4 km away / 10 August 2021Granted
- 21104REPLACEMENT OF AN EXISTING 20 METER HIGH TELECOMMUNICATIONS STRUCTURE WITH 25 METER HIGH TAPERED STEEL MONOPOLE WITH ANTENNAE DISHES AND ALL OTHER ANCILLARY EQUIPMENT WITHIN A 2.4 METER HIGH FENCED COMPOUND TO ALLOW FOR ADDITIONAL CO-LOCATION OF TELECOMMUNICATION OPERATIONS / 1.5 km away / 06 April 2021Granted
- 18762RETAIN AND COMPLETE PASTEURISATION/PUMP ROOM, OFFICES, MACHINERY SHED, NEW ENTRANCE ROAD ONTO PUBLIC ROAD AND ALL ASSOCIATED ANCILLARY SITE WORKS.PLANNING PERMISSION TO CONSTRUCT TWO DIGESTION TANKS, A STORAGE SILO, AN ESB SUBSTATION FOR THE COMPLETION OF AN AGRICULTURAL ANAEROBIC DIGESTION FACILITY / 1.5 km away / 15 March 2019Granted
- 20673PERMISSION CONSTRUCT 1. TWO DIGESTION TANKS, 2. A STORAGE SILO WITH ASSOCIATED SUMP TANK, 3. BIOGAS FLARE, 4. AN ESB SUBSTATION FOR THE COMPLETION OF AN AGRICULTURAL ANEROBIC DIGESTION FACILITY, 5. A CONCRETE UNDERGROUND COVERED SOILED WATER TANK, 6. TO CONSTRUCT A WATER ATTENUATION TANK OR STORM/ RAIN WATER ON SITE, 7. A PERCOLATION AREA FOR THE SOILED YARD RAINWATER COMPLETE WITH CLASS 1 OIL INTERCEPTOR/ SEPARTOR AND SILT TRAPS, 8. TO RETAIN AND COMPLETE BUILDING CONTAINING PASTEURISATION PUMP ROOM, OFFICES COMBINED HEAT AND POWER ENGINE (CHP), 9. RETAIN MACHINERY SHED, 10. RETAIN UNDERGROUND CONCRETE TANK, 11. RETAIN NEW ENTRANCE ROAD ONTO PUBLIC ROAD, 12. AND ALL ANCILLARY SITE WORKS / 1.6 km away / 16 December 2020Granted