KILLOWEN, KENMARE, CO KERRY
Planning application 191047
DecisionConditional grant
Decided03 December 2019
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KILLOWEN, KENMARE, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22683(A) DEMOLISH EXISTING DWELLING HOUSE WITH SEPTIC TANK AND (B) TO CONSTRUCT A REPLACEMENT DWELLING HOUSE, TO MAKE ALTERTIONS AND EXTEND THE EXISTING GARAGE STRUCTURE AND TO INSTALL A NEW WASTE WATER TREATMENT SYSTEM INCLUDING ALL NECESSARY ANCILLARY SERVECES WORKS AND SITE WORKS / 0.1 km away / 22 August 2022Granted
- 2360322The development consists of (a) retention permission to retain elevational changes made to the house, (b) permission to construct a canopy at the front of the house and a carport at the side of the house, (c) permission to make alterations to the elevations of the house, and (d) permission for all ancillary works. / 0.1 km away / 17 January 2024Granted
- 2138CONSTRUCT A NEW SITE ENTRANCE TO ACCESS HER EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 15 March 2021Granted
- 17729RETAIN EXISTING REAR EXTENSION / 0.2 km away / 14 September 2017Granted
- 221301REPLACE TWO EXISTING WINDOWS WITH ONE LARGER WINDOW TO THE FRONT OF THEIR EXISTING DWELLING HOUSE AT GROUND FLOOR LEVEL, INSTALL A ROOF WINDOW TO THE FRONT AND ALL OTHER ASSOCIATED SITE WORKS / 0.2 km away / 15 February 2023Granted
- 20138CONSTRUCTION OF A SINGLE STOREY, SIDE EXTENSION TO A DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 24 March 2020Granted
- 17243REPLACE TWO EXISTING WINDOWS WITH ONE LARGER WINDOW TO THE FRONT OF EXISTING DWELLING HOUSE AT GROUND FLOOR LEVEL, INSTALL TWO NEW ROOF LIGHTS TO EXISTING ROOF AND ALL OTHER ASSOCIATED WORKS / 0.2 km away / 12 May 2017Granted
- 17242REPLACE TWO EXISTING WINDOWS WITH ONE LARGER WINDOW TO THE FRONT OF EXISTING DWELLING HOUSE AT GROUND FLOOR LEVEL AND ALL OTHER ASSOCIATED WORKS / 0.2 km away / 12 May 2017Granted