KNOCKACLARE, LYREACROMPANE, LISTOWEL
Planning application 191178
DecisionRefused
Decided21 January 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KNOCKACLARE, LYREACROMPANE, LISTOWEL?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19302(A) DEMOLISH AN EXISTING DWELLING HOUSE AND ACCOMPANYING OUT BUILDING(S), (B) CONSTRUCT A NEW DWELLING HOUSE WITH A NEW ON-SITE WASTEWATER TREATMENT SYSTEM COMPRISING OF A MECHANICAL AERATION UNIT, INTERMITTENT FILTER AND SOIL POLISHING FILTER AND (C) ALL ASSOCIATED SITE WORKS / 0.0 km away / 17 May 2019Refused
- 201284THE DEVELOPMENT A SOLAR PV FARM AND BATTERY STORAGE FACILITY. THE PROPOSED DEVELOPMENT WILL BE COMPRISED OF 143,469 NO. (280,000 SQ. METERS) PHOTOVOLTAIC (PV) GALVANISED STEEL, OR ALUMINIUM PANELS ON GROUND MOUNTED FRAMES, 18 NO. INVERTER/TRANSFORMER STATIONS (CONTAINING 34 NO. INVERTERS AND 18 NO. TRANSFORMERS), 1 NO. SOLAR FARM SUBSTATION, 1 NO. BATTERY STORAGE FACILITY (CONTAINING 60 NO. BATTERY CONTAINERS, 14 NO. CONVERTER CONTAINERS AND 14 NO. STEP-UP TRANSFORMERS), GRID CONNECTION TO THE ADJOINING EIRGRID CLAHANE 110KV SUBSTATION, AND ALL ANCILLARY DEVELOPMENT INCLUDING 1 NO. TEMPORARY CONSTRUCTION COMPOUND, 3 NO. TEMPORARY STORAGE AREAS, UNDERGROUND INTERNAL ELECTRICAL CABLING, UPGRADE OF EXISTING SITE ENTRANCE, 2, 100M OF NEW INTERNAL ACCESS TRACKS, UPGRADE OF 2,550M OF EXISTING INTERNAL ACCESS TRACKS, FELLING OF APPROXIMATELY 24.3HA OF CONIFEROUS FORESTRY, 4,360M OF PERIMETER FENCING 2.8M HIGH, CCTV CAMERAS AND LANDSCAPING. AN NIS HAS BEEN PREPARED IN RESPECT OF THE APPLICATION. / 2.8 km away / 25 February 2021Refused
- 18467INSTALL A PREFABRICATED BUILDING AND WASTE WATER TREATMENT UNIT AND ALL ASSOCIATED SITE WORKS FOR USE AS A PRESCHOOL AT ST SEAN'S GAA GROUNDS / 4.5 km away / 11 July 2018Refused
- 181101CONSTRUCT A SPLIT LEVEL ONE AND A HALF STOREY DOMESTIC DWELLING HOUSE, ACCESS DRIVE, EXTERNAL STORE AND ALL ASSOCIATED EXTERNAL WORKS, SERVICING AND LANDSCAPING AND THE INSTALLATION OF A MECHANICAL AERATION UNIT POLISHING FILTER / 4.7 km away / 11 January 2019Refused
- 201262CONSTRUCT (A) A SINGLE STOREY SPLIT LEVEL DWELLING, SERVICED BY A SEPTIC TANK AND PERCOLATION AREA (B) A DOMESTIC GARAGE (C) A VEHICULAR ACCESS, AND ASSOCIATED DRIVEWAY (D) ALL ASSOCIATED SITE WORKS / 5.0 km away / 24 February 2021Refused
- 2561068Retention permission to retain existing caravan on site / 5.3 km away / 21 January 2026Refused
- 22173RETAIN JOINERY WORKSHOP AS CONSTRUCTED AND PERMISSION TO MAKE CHANGES TO THE ELEVATIONS AND CHANGE THE ROOF FROM A PITCHED ROOF TO A LEAN TO ROOF TO JOINERY WORKSHOP / 5.7 km away / 11 April 2022Refused
- 19393RETAIN JOINERY WORKSHOP AS CONSTRUCTED AND PERMISSION TO MAKE CHANGES TO THE ELEVATION AND CHANGE THE ROOF FROM A PITCHED ROOF TO A LEAN TO ROOF / 5.7 km away / 10 June 2019Refused