BANSHAGH AND CLOONCARRIG, KILLORGLIN, CO KERRY
Planning application 19235
DecisionConditional grant
Decided30 April 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near BANSHAGH AND CLOONCARRIG, KILLORGLIN, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18292CONSTRUCT A TWO-STOREY EXTENSION AT THE NORTHERN SIDE OF THE MAIN PRODUCTION BUILDING TO ACCOMMODATE AN ENCLOSED STAIRWELL AND TO CARRY OUT ASSOCIATED EXTERNAL WORKS AT ITS PLANT / 0.0 km away / 23 May 2018Granted
- 2460704The proposed development will consist of a.) a full decommissioning and removal of existing 0.8MW Wind Turbine b.) Construction of a new 2.35MW Wind Turbine with a hub height of 58.9 metres, a rotor diameter of 82 metres and an overall tip height of 99.9 metres c.) wind turbine foundation d.) hardstanding area e.) underground electrical cables and f.) all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with application the application. / 0.0 km away / 18 February 2025Granted
- 2660296Permission for an extension to the existing Recycling Store together with all associated site works / 0.0 km away / 28 May 2026Granted
- 20901CONSTRUCT A NEW RECEPTION EXTENSION AT GROUND FLOOR, NEW EXTENSION AT FIRST FLOOR ON THE EAST ELEVATION OF THE EXISTING FACILITY, INFRASTRUCTURE INCLUDING CAR PARKING AND ALL ASSOCIATED SITE WORKS / 0.1 km away / 24 November 2020Granted
- 22209UPGRADE WORKS TO INCLUDE DEMOLITION OF EXISTING RECEPTION ANNEX AND THE CONSTRUCTION OF A NEW REPLACEMENT RECEPTION TOGETHER WITH ALL ASSOCIATED SITE WORKS. / 0.2 km away / 21 April 2022Granted
- 2360319THE DEVELOPMENT WILL CONSISTS OF: ERECT 9,381.00 M2 OR 1.20 MWp OF PHOTOVOLTAIC PANELS, GROUND MOUNTED SYSTEM, ON THE FIELD LOCATED AT THE LEFT AND THE NORTH OF THE MAIN EXISTING BUILDINGS, PHARMACEUTICAL PLANTS, WITH ALL ASSOCIATES SITE WORKS AT TEMMLER IRELAND LIMITED. THE SITE IS CURRENTLY OPERATING UNDER AN INTEGRATED POLLUTION CONTROL LICENCE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, P0813-02. THE DEVELOPMENT WILL COMPRISE PHOTOVOLTAIC PANELS WITH GROUND MOUNTED FRAMES WITH ALL ANCILLARY CABLING AND ELECTRICAL INFRASTRUCTURE; 1 NO. TRANSFORMER CABIN; USING ALL TEMPORARY WAYS, TEMPORARY CONSTRUCTION COMPOUND / SET-DOWN AREA AND THE FENCE AROUND THIS FIELD. / 0.2 km away / 16 January 2024Granted
- 23501ERECT A NEW 2.4M HIGH PALADIN FENCE TO ENCLOSE THE PERIMETER OF THIS SITE, NEW INTERNAL ACCESS TRACK TOGETHER WITH ALL ASSOCIATED SITE WORKS / 0.3 km away / 28 June 2023Granted
- 2360423The development will consist of the construction of 2.99acres/1.21ha or 1.6MW of Photovoltaic panels on ground mounted frames within a site area located to the south of the main production facility, associated ancillary cabling and ducting, electrical infrastructure, LV/MV Skid, transformer cabin and internal access tracks together with all associated site works. / 0.3 km away / 20 February 2024Granted