KERRY AIRPORT, FARRANFORE, CO KERRY
Planning application 19335
DecisionConditional grant
Decided10 July 2019
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near KERRY AIRPORT, FARRANFORE, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360448Planning Permission to erect 23,921.86m2 of photovoltaic panels on a ground mounted system located on the existing green area between the taxiway and the runway and all associated site works at Kerry Airport PLC. The development will comprise photovoltaic panels, 2.5 MWp with ground mounted frames with all ancillary cabling and electrical infrastructure, including a new trench for duct work at the switch room situated at the front of the main carpark; 1 no. lv/mv and transformer cabin; using all temporary ways to have access to the welfare facilities at the back of the hanger number 2. / 0.3 km away / 22 February 2024Granted
- 19817CONSTRUCT A VEHICLE AND MACHINERY PARKING SHED WITH ALL ASSOCIATED ANCILLARY SITE WORKS WITHIN THE KERRY AIRPORT SITE / 0.6 km away / 19 November 2019Granted
- 221054(1) REMOVE EXISTING BAGGAGE CLAIM AREA TO PROVIDE NEW DEPARTURE GATE (2) CONSTRUCT A NEW EXTENSION TO MAIN AIRPORT BUILDING TO ALLOW FOR (1) SIT DOWN RESTAURANT AND BAR AREA (11) ARRIVAL AREAS (111) LUGGAGE RECLAIM AREA (1V) CUSTOMS, OFFICES, SECURITY AND WC'S AND (3) NEW COACH SET DOWN PARKING AREA AND (4) UPGRADE EXISTING WASTEWATER TREATMENT PLANT AND TO INSTALL A TERTIARY SAND POLISHING FILTER AND (5) ALL ANCILLARY SITE DEVELOPMENT WORKS / 0.8 km away / 08 August 2023Granted
- 1756(A) CONSTRUCT A STORAGE UNIT WITH GROUND AND FIRST FLOOR MEZZANINE OFFICE SPACE IN EXISTING COMPOUND AND (B) PERMISSION TO DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW TREATMENT UNIT WITH POLISHING FILTER ALL / 0.9 km away / 18 April 2017Granted
- 2460474Construction of a livestock underpass, effluent holding tank and all associated site works / 1.1 km away / 30 July 2025Granted
- 211486(01) DEMOLISH EXISTING SINGLE STOREY DWELLING HOUSE AND ASSOCIATED REAR EXTENSIONS INCLUDING A STANDALONE OUT BUILDING (02) CONSTRUCT A NEW DWELLING HOUSE (03) DEMOLISH PART OF THE EXISTING ENTRANCE WALLS AND WIDEN THE EXISTING SITE ENTRANCE WITH THE CONSTRUCTION OF NEW SPLAYED ENTRANCE WALLS (04) TO DECOMMISSION THE EXISTING SEPTIC TANK AND PERCOLATION AREA (05) INSTALL A NEW ON-SITE WASTEWATER TREATMENT SYSTEM. THE PROPOSED INSTALLATION WILL INCLUDE A TRICEL P6 OR EQUIVALENT, WITH DISCHARGE TO A STILLING CHAMBER THAT DISCHARGES TO A PERCOLATION AREA INCLUDING ALL ASSOCIATED ANCILLARY SITE WORKS / 1.2 km away / 09 June 2022Granted
- 21230ERECT 6 NO. LIGHTING COLUMNS AND FLOOD LIGHTS WITH ASSOCIATED SITE WORKS AND SERVICES / 1.2 km away / 02 March 2022Granted
- 18532CONSTRUCT PROPOSED STORAGE SHED WITH ALL ASSOCIATED SITE WORKS AND SERVICES / 1.2 km away / 19 July 2018Granted