LENMANORE, BALLYLONGFORD, CO KERRY
Planning application 20231
DecisionConditional grant
Decided17 June 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near LENMANORE, BALLYLONGFORD, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211233RETAIN DOMESTIC GARAGE AS CONSTRUCTED / 0.2 km away / 16 December 2021Granted
- 2460885Planning permission for the following: Extend existing protected structure “RPS-KY-0134” including the removal of the North West corner wall of the existing rear extension, erect a new single story extension with attic storage to the north west of existing thatched house, decommission existing septic tank and install a new mechanical treatment unit and polishing filter, retention permission to retain existing porta cabins (One as a home office & One as a store) and old shed and retention permission to retain existing mobile home until proposed extension is finished. Permission for all ancillary site works associated with the development including parking and turning areas on our site / 0.3 km away / 17 January 2025Granted
- 201221ERECT A DWELLING HOUSE, INSTALL AN IRL8 TRICEL NOVA WASTEWATER TREATMENT PUMPED UNIT AND SANDCEL TERITARY TREATMENT SYSTEM AND CARRY OUT ALL ASSOCIATED SITE WORKS / 0.6 km away / 16 February 2021Granted
- 23284APPLY FOR A 10 YEAR PERMISSION AND 40 YEAR OPERATION FOR A SOLAR FARM OF 146.6 HECTARES, ON 3 NO. LAND PARCELS CONSISTING AS DESCRIBED HERIN: WEST PARCEL( BALLYMACASY, BALLYLINE EAST AND BALLYLINE WEST TOWNLANDS) C 58.48 HECTARES, CENTRAL PARCEL ( COOLNAGRAIGUE TOWNLAND) C. 53.8 HECTARES AND EAST PARCEL ( LEANAMORE AND DROMALIVAUN TOWNLANDS) C 34.32 HECTARES, A ROUTE CORRIDOR FOR AN UNDER GROUND INTERNAL ELECTRICAL CABLE CONNECTING THE WEST AND CENTRAL PARCELS TO THE EAST PARCEL CONSISTING OF C 3772 METERS IN LENGTH.THE TOTAL SITE AREA FOR THE PROPOSED DEVELOPMENT IS C. 146.6 HECTARES AND CONSISTS OF THE FOLLOWING: 794,430 SQ METERS OF SOLAR PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES, INVERTER/TRANSFORMER STATIONS, UNDERGROUND POWER AND COMMUNICATION CABLES AND DUCTS, BOUNDARY SECURITY FENCING, 2 NO.MEDIUM VOLTAGE (MV) CONTROL BUILDINGS, NEW INTERNAL ACCESS TRACKS AND ASSOCIATED DRAINAGE INFRASTRUCTURE, UPGRADE OF 1 NO. SITE ENTRANCE OFF THE LIO12 LOCAL ROAD AND 1 NO. NEW SITE ENTRANCE OFF THE L 6021 LOCAL ROAD, CCTV/LIGHTING POSTS, 5 NO. CULVERT CROSSINGS, BIODIVERSITY ENHANCEMENT, LANDSCAPING AND ALL ASSOCIATED SITE SERVICES AND WORKS. INSTALLATIONS OF AN INTERNAL NETWORK CABLE COMPRISE TRENCHING FOR AN UNDERGROUND MEDIUM VOLTAGE ELECTRICAL CABLE AND ASSOCIATED JOINT BAYS AND INFRASTRUCTURE, FOR A DISTANCE OF APPROXIMATELY 35 METRES IN LENGTH ALONG THE L6021 AND APPROXIMATELY 3,737 METRES WITHIN THE SOLAR FARM LANDS.AS PART OF A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT (SID) PLANNING APPLICATION, PROVISION OF A 110KV ELECTRICAL SUBSTATION WOTH ELECTRICAL CONTROLBUILDING, ASSOCIATED COMPOUND WITH PALISADE FENCE AND 2 NO. OVERHEAD LINE MASTS, WILL BE LODGED WITH AN BORD PLEANALA IN DUE COURSE. THE PROPOSED SUBSTATION IS TO BE LOCATED IN THE EAST PARCEL IN THE TOWNLAND OF DROMALIVAUN WITH CONNECTION TO THE EXISTING OVERHEAD LINES IN EITHER THE EAST PARCEL IN THE TOWNLAND OF DROMALIVAUN OR THE CENTRAL PARCEL IN THE TOWNLAND OF LENAMORE. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RELATION TO THE PROJECT AND ACCOMPANIES THIS PLANNING APPLICATION. / 0.8 km away / 13 September 2023Granted
- 21386CONSTRUCT AN EASY FEED CATTLE SHED FOR OVER WINTERING COWS INCLUDING ALL ASSOCIATED CONCRETE AND SITE WORKS / 0.9 km away / 08 June 2021Granted
- 20591CONSTRUCT AN UNROOFED UNDERGROUND SLURRY STORAGE TANK WITH CONCRETE SLATS AND ASSOCIATED FEED PASSAGE AND CONCRETE FLOOR FOR OVER WINTERING COWS COMPLETE WITH EASY FEED BARRIERS, INCLUDING ALL ASSOCIATED ANCILLARY CONCRETE AND SITE WORKS. ALL THIS WORK TO BE CARRIED OUT ON HIS FARM / 0.9 km away / 28 August 2020Granted
- 18280RETAIN HIS UTILITY STORE AS CONSTRUCTED ALSO RETAIN HIS DWELLING HOUSE ALL WITHIN REVISED SITE BOUNDARIES TO HIS SITE / 1.0 km away / 22 May 2018Granted
- 17339MODIFY THE ALIGNMENT OF A 210M LONG SECTION OF PERMITTED WIND FARM ACCESS ROAD AND ASSOCIATED DRAINAGE (PREVIOUSLY GRANTED UNDER PLANNING REG 11/299). THE MODIFICATION CONSISTS OF MOVING THE ALIGNMENT OF THE ROAD SOUTH WEST BY A MAXIMUM DISTANCE OF 25M. / 1.6 km away / 08 June 2017Granted