TULLAHENNEL NORTH, BALLYLONGFORD, CO KERRY
Planning application 21182
DecisionConditional grant
Decided21 April 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near TULLAHENNEL NORTH, BALLYLONGFORD, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 24185TO CREATE AN AGRICULTURAL ENTRANCE ON HIS LAND / 0.7 km away / 19 September 2024Granted
- 2660413(a) Construct a single storey extension to the front south elevation, side west elevation and the rear north elevation of the existing dwelling, (b) decommission the existing septic tank, (c) installation of a new tricel novo secondary treatment unit leading to a tricel tero tertiary treatment module on a raised distribution area, (d) form a new entrance to serve the existing dwelling and all necessary ancillary site works / 1.1 km away / 03 July 2026Granted
- 17654FOR THE CONSTRUCTION OF TWO ELECTRICAL EQUIPMENT UNITS, ADJACENT TO THE EXISTING WIND TURBINES. THE ELECTRICAL EQUIPMENT UNITS ARE COMPRISED OF TWO MODULAR STEEL CABINETS PLACED ON A CONCRETE PLINTH, LOCATED ON THE TURBINE FOUNDATION / 1.2 km away / 31 August 2017Granted
- 171146EXTEND THE OPERATIONAL LIFE OF THE EXISTING WIND FARM FROM 20 TO 25 YEARS. THE PERMISSION RELATES TO THE CONTINUANCE OF USE OF THE EXISTING WIND FARM GRANTED UNDER PLANNING REF 09/1175 AND 15/725 FOR A FURTHER PERIOD OF FIVE YEARS. AN EIAR HAS BEEN COMPLETED AND LODGED WITH THIS APPLICATION / 1.2 km away / 19 January 2018Granted
- 171148EXTEND THE OPERATIONAL LIFE OF THE EXISTING WIND FARM FROM 20 TO 25 YEARS. THE PERMISSION RELATES TO THE CONTINUANCE OF USE OF THE EXISTING WIND FARM GRANTED UNDER PLANNING REF 08/2086 AND 15/701 FOR A FURTHER PERIOD OF FIVE YEARS. AN EIAR HAS BEEN COMPLETED AND LODGED WITH THIS APPLICATION / 1.3 km away / 19 January 2018Granted
- 17652FOR THE CONSTRUCTION OF TWO ELECTRICAL EQUIPMENT UNITS, ADJACENT TO THE EXISTING WIND TURBINES. THE ELECTRICAL EQUIPMENT UNITS ARE COMPRISED OF TWO MODULAR STEEL CABINETS PLACED ON A CONCRETE PLINTH LOCATED ON THE TURBINE FOUNDATION / 1.4 km away / 31 August 2017Granted
- 23952THE ERECTION OF 8 NO. METER HIGH FLOODLIGHTS AROUND PLAYING PITCH / 1.5 km away / 25 October 2023Granted
- 20544TO RETAIN THE DWELLING HOUSE AS CONSTRUCTED ON SITE WITHIN REVISED SITE BOUNDARIES AND PERMISSION TO CONSTRUCT A REAR AND SIDE EXTENSION ONTO THE EXISTING DWELLING HOUSE, ELEVATION CHANGES, INTERNAL ALTERATIONS AND ALL ASSOCIATED SITE WORKS / 1.6 km away / 24 September 2020Granted