GURTEENNACLOONA, BALLYLONGFORD, COUNTY KERRY
Planning application 21431
DecisionRefused
Decided24 February 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near GURTEENNACLOONA, BALLYLONGFORD, COUNTY KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2656Construct a community Playground including associated ancillary site works / 1.7 km away / 18 May 2026Refused
- 18324CONSTRUCT A PRIVATE DWELLING HOUSE, WASTE WATER TREATMENT PLANT, ACCESS ROAD AND ALL ANCILLARY WORKS / 2.1 km away / 01 June 2018Refused
- 181122STRIP TOPSOIL, FILL LANDS WITH CLEAN EXCAVATED SOIL MATERIAL AND BUILDING RUBBLE AND TO REPLACE THE STRIPPED TOPSOIL TO LEVELS, TO UPGRAGE LANDS / 2.2 km away / 08 August 2019Refused
- 20438AMEND A PREVIOUSLY GRANTED PERMISSION (KERRY COUNTY COUNCIL PLANNING REF 19/381) ( AN BORD PLEANALA REF ABP- 304807-19) WHICH RELATES TO A CHANGE IN THE GRID CONNECTION ROUTE FOR THE PERMITTED WIND FARM. THE REVISED ROUTE WILL ENTAIL THE CONSTRUCTION OF APPROXIMATELY 12.1KM OF 38KV UNDERGROUND ELECTRIC CABLE CONNECTING THE EXISTING PERMITTED WINDFARM (19/381) TO THE 38Kva/110Kva SUBSTATION AT KILPADDOGE, TARBERT. THE UNDERGROUND CABLES WILL BE LOCATED ALONG THE PUBLIC ROADS R551, R552 AND L-1010 AND ALONG 2 SECTIONS OF PRIVATE PROPERTY. THE CABLE WILL BE INSTALLED IN EXCAVATED TRENCHES APPROXIMATELY 1.2M IN DEPTH AND WILL INCLUDE ASSOCIATED UNDERGROUND DUCTING JOINT BAYS, COMMUNICATION CHAMBER BAYS, DRILL PITS, SHEATH LINK BOXES AND INSPECTION CHAMBERS, ASSOCIATED EQUIPMENT AND ALL ANCILLARY SITE AND GROUND WORKS. THE DEVELOPMENT WILL ALSO CONSIST OF THE CONNECTION OF THE PERMITTED WINDFARM (19/381), VIA EXISTING PERMITTED UNDERGROUND ELECTRICITY CABLES, TO THE PROPOSED CABLE.THE UNDERGROUND CABLE WILL BE LOCATED IN THE TOWNLANDS OF BALLYLINE WEST, BALLYMACASY, LISLAUGHTIN, GLANCULLARE SOUTH, GURTEENAVALLIG,MEELCON CARHOONA, FARRANAWANA, DOONARD UPPER, DOONARD LOWER TARBERT AND KILPADDOGE ' THE APPLICANT IS SEEKING A TEN YEAR PLANNING PERMISSION AND OPERATIONAL PERIOD OF 25 YEARS. AN APPROPRIATE ASSESSMENT SCREENING REPORT AND AN ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REPORT HAS BE PREPARED AND SUBMITTED AS PART OF THIS APPLICATION. AN NIS HAS BEEN SUBMITTED WITH THIS APPLICATION / 3.2 km away / 28 October 2020Refused
- 211312CONSTRUCT A DWELLING HOUSE WITH MECHANICAL TREATMENT UNIT AND POLISHING FILTER AND ALL ASSOCIATED WORKS / 3.5 km away / 05 May 2022Refused
- 20549ERECT A DORMER TYPE DWELLING HOUSE, INSTALL A SEPTIC TANK AND PERCOLATION AREA AND UPGRADE EXISTING FARM ROAD CARRY OUT ALL ASSOCIATED SITE WORKS / 3.8 km away / 12 July 2021Refused
- 211022CONSTRUCT 8 DWELLING HOUSES, SEMI-DETACHED STYLE, TOGETHER WITH ALL SITE SERVICES, SITE ROAD, AND A PUBLIC SEWER CONNECTION / 4.2 km away / 13 June 2022Refused
- 2560123Planning permission to construct 8 No. units, three-bed two-storey dwellings, 16 parking spaces a new connection to water and sewage mains and all associated site works all at Moyvane North, Moyvane, Co.Kerry / 4.2 km away / 22 April 2025Refused