GrantedDecided 19 July 2021Kerry County Council

KILPADDOGE, TARBERT, CO KERRY

Planning application 21549
DecisionConditional grant
Decided19 July 2021
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Kerry County Council.
(A) A HIGH INTERTIA SYNCHRONOUS COMPENSATOR (HISC) COMPOUND CONTAINING 1 NO. HISC UNIT ENCLOSED WITHIN A STEEL CLAD FRAMED STYLE STRUCTURE (12.1M MAX HEIGHT) AND SUPPPORTED BY 8 NO. ELECTRICAL EQUIPMENT CONTAINERS (CONTAINING ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FEQUENCY CONVERTS, MV SWITCHGEAR, EXCITERS, LV DISTRIBUTION, CONTROL ROOM, WELFARE AND OFFICE), MAIN AUXILIARY AND START-UP ELECTRICAL TRANSFORMERS, GENERATOR CIRCUIT BREAKER, SWITCHGEAR EQUIPMENT, EXTERNAL COOLER UNITS AND 1 NO. BACK UP DIESEL GENERATOR AND ASSOCIATED DIESEL STORAGE TANK; (B) A 220KV HIGH VOLTAGE GAS INSULTATED SWITCHGEAR (GIS) SUBSTATION COMPOUND CONTAINING A GIS SUBSTATION BUILDING WITH ALL CONTROL AND HV EQUIPMENT WITHIN A SINGLE STOREY BUILDING (13.2M MAX HEIGHT). THE BUILDING WILL BE SURROUNDED BY A COMPOUND ROAD AND CONTAINED WITHIN A 2.6M HIGH GALVANISED STEEL PALISADE FENCE; (C) A BATTERY STORAGE COMPOUND CONTAINING 5 NO. BATTERY STORAGE CONTAINERS, ENCLOSED IN STEEL CONTAINERS OF DIMENSIONS APPROXIMATELY 13M BY 2.5M BY 3M, HOUSING INDIVIDUAL BATTERY COMPONENTS WITH 2 NO FITTED EXTERNAL HVAC SYSTEMS FOR EACH UNIT AND SUPPORTED BY 13 NO. INVERTER STATIONS, 14 NO. AUXILIARY TRANSFORMERS AND CONTROL CONTAINER; (D) 220KV UNDERGROUND CABLE TO THE EXISTING ADJOINING EIRGRID SUBSTATION; (E) ASSOCIATED ELEMENTS COMPRISING VARIOUS UNDERGROUND CABLES AND DUCTS, EQUIPMENT PLINTHS, BOUNDARY SECURITY FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, SECUIRTY LIGHTING, CCTV, INTERNAL ACCESS ROADS, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATIONS WORKS FOR THE ABOVE COMPOUNDS. THE PLANNING APPLICATION IS ON LANDS WHERE GRID STABILISATION FACILITY WAS PREVIOUSLY PERMITTED UNDER PLANNING REGISTER NO 19/115. PLANNING PERMISSION TO CONSTRUCT THE DEVELOPMENT IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT AND ACCOMPANIES THE APPLICATION

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Kerry has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near KILPADDOGE, TARBERT, CO KERRY?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →